Indicates careful attention is required. The instruc- This product is warranted for two years from date of delivery. tion includes protective information for the device and Please refer to Teikoku USA’s Terms and Conditions of Sale for product. additional warranty coverage and restrictions.
Page 3
If published procedures are not available, check The internal pressure can be higher than the atmosphere. with Teikoku before operating the equipment. Ensure that the pump and motor are properly de-pressur- ized and decontaminated prior to performing any work.
Additional copies of this manual are is mounted on one end of the rotor shaft which extends from the available from Teikoku field representative or from the factory. motor section into the pump casing. The rotor is submerged in the fluid being pumped and is "canned"...
Suction strainer to be sized and designed per 2.2.1 Pump Location Teikoku recommendations. The screen can be installed for Locate the pump as close as possible to the fluid supply with a 24 hours of operation, but must be monitored closely so positive suction head.
TRG voltmeter. If suction pipe length is short, pipe diameter can be the same size The initial display of the TRG meter is adjusted in the Teikoku as the pump suction port diameter. If suction piping is long, the factory, but each meter will show subtle differences.
3.1 Amps push button station shown. Thermoswitch (thermal cut-out in- 230 Volt 1.6 Amps side Teikoku motor) is wired in series with holding coil circuit by 460 Volt 0.8 Amps removing jumper between over load cut-outs as shown. Be sure to size heaters properly. Rating should be as close as pos- Caution! sible to current draw noted on pump nameplate.
2.3.8 Electrical Isolation To eliminate electrolytic corrosion when handling solutions during an electrolysis or plating operation, the NC-Series pump should be electrically isolated. Insulated couplings or nonconductive plas- Teikoku USA | Chempump Instruction Manual NC-Series 0220...
4.) CURRENT RATINGS BASED ON THREE CONDUCTOR 75O C INSULATED COPPER WIRE AT 30O C AMBIENT. 2.) ( ) INDICATES REDUCTION IN SWITCH SIZE WHEN DUAL-ELEMENT FUSES ARE USED FOR MOTOR BRANCH CIRCUITS. 5.) INDUCTION MOTOR, SYNCHRONOUS SPEED 3600 RPM. Teikoku USA | Chempump Instruction Manual NC-Series 0220...
4.) CURRENT RATINGS BASED ON THREE CONDUCTOR 75O C INSULATED COPPER WIRE AT 30O C AMBIENT. 2.) ( ) INDICATES REDUCTION IN SWITCH SIZE WHEN DUAL-ELEMENT FUSES ARE USED FOR MOTOR BRANCH CIRCUITS. 5.) INDUCTION MOTOR, SYNCHRONOUS SPEED 3600 RPM. Teikoku USA | Chempump Instruction Manual NC-Series 0220...
4.) CURRENT RATINGS BASED ON THREE CONDUCTOR 75O C INSULATED COPPER WIRE AT 30O C AMBIENT. 2.) ( ) INDICATES REDUCTION IN SWITCH SIZE WHEN DUAL-ELEMENT FUSES ARE USED FOR MOTOR BRANCH CIRCUITS. 5.) INDUCTION MOTOR, SYNCHRONOUS SPEED 3600 RPM. Teikoku USA | Chempump Instruction Manual NC-Series 0220...
Procedure: 1. Remove the circulation tube and plug off the port in the dis- charge neck of the pump casing. (This is done at the factory if specified in the order). Teikoku USA | Chempump Instruction Manual NC-Series 0220...
Save time and money by checking adjustment in the time frame or differential pressure set points before start-up. they typically will not meet Teikoku’s pressure and time delay rec- ommendations. Attention! The preferred method to monitor the input power to the pump would be to use a power monitor like the Load Controls PMP-25.
The Teikoku TRC-1 hand-held direction of rotation indicator is the correct direction of rotation. is available from Teikoku USA. This portable device can be used to 7. Once direction of rotation has been verified, stop the pump confirm the rotation of any motor.
Page 18
If the pump appears to be airbound as a result of the unit not being properly primed, do not continue operation. Lo- cate and correct the conditions that prevent proper prim- ing before attempting to start the unit. Teikoku USA | Chempump Instruction Manual NC-Series 0220...
23. Withdraw the rotor assembly from front of motor section from the piping. taking care not to allow rotor to drop, allowing shaft to hit stator liner. Teikoku USA | Chempump Instruction Manual NC-Series 0220...
Table 4-3. NCT- Series Bearing and Journal Dimensions Bearing Diametrical Model Unit Shaft Sleeve Inside DIA Clearance Max Allowable Length INCHES 1.6220 - 1.6213 1.626 - 1.627 0.004 - 0.0057 .014 6.38 0.02 0.005 11.8 Teikoku USA | Chempump Instruction Manual NC-Series 0220...
Page 21
Proper service will be facilitated with the prop- circulation tubes, etc.) Rear bearing housing temperature can be er submittal of a Teikoku Field Service Report Form. These checked by using a pyrometer or a standard thermometer held forms are available from the factory , from the Teikoku against the retainer by putty.
Teikoku representative/distributor or contact the Table 4-6. Coil Resistance Values factory for more information. Motor Size Voltage Insulation Resistance Max Ohm var Class (ohms) (Motor - Motor) It is recommended that the following parts listed on the opposite (+/-) column be maintained as "on-hand"...
The design of canned motor pumps is such that the rotating element cannot be seen while it is in operation. For this reason, Teikoku supplies an internal rotation indicator with a majority of our pumps. However, there are some instances where this device is not supplied, so we recommend purchasing the TRC-1.
Make sure pump is operating at design point and conditions specified Motor operating at overload condition. when purchased. Pump is operating below minimum flow. Increase flow through the pump. Pump is running dry. Check suction line for obstructions and closed valves Teikoku USA | Chempump Instruction Manual NC-Series 0620...
Attach completed material safety data sheets (MSDS) for these fluids. If either fluid is proprietary, please attach a description of any characteristics that will assist Teikoku USA in safe handling. Without detailed and complete information on the pumped fluid, we will not be able to process your order.
Page 35
For pumps with shaft sleeves, complete disassembly will be required to remove trapped fluid. Flush all auxiliary tubing, piping and equipment such as heat exchangers. For any questions on decontamination, contact your Teikoku service representative. See sections "B" through "D" for stator assembly decontamination requirements where a liner breach is suspected.
Page 36
If the connection box is to be returned, assure that all components have been decontaminated. D. For all Teikoku pumps, LE stators, G and NC stators with TRG. If a stator liner rupture is suspected, follow this section to flush the stator cavity. Caution: if this step is followed, the motor must be rewound.
Teikoku USA policy requires that an RMA be generated prior to the shipment of pumps or components to any Teikoku USA facility. With the shipment Teikoku USA also requires a copy of the RMA, a completed Teikoku USA Decontamination Form, an SDS for the process fluid to which the pumps or parts were subjected and an SDS on the decontamination flush fluid that was used to decontaminate the equipment.
Need help?
Do you have a question about the CHEMPUMP NC Series and is the answer not in the manual?
Questions and answers