Operation
6
6.1 Commissioning
ATTENTION
Beware of the safety/warning instructions before commissioning (see chapter 2
Safety).
STORAGE
When the device is brought to the installation site for commissioning after storage
in a cold environment, condensation may occur.
Wait at least one hour before switching on until the device has reached ambient
temperature and is absolutely dry.
Procedure
1. Check that the attachment parts are intact.
2. Check all connections according to chapter 5.4 Connect.
3. Open the coolant.
4. Turn on the device at the main switch (Fig. 5-2/2).
5. Check the tightness of the pneumatic connections and equipment.
6. Check operating behaviour, e.g., for unusual running noises.
6.2 Safe operation
SAFE OPERATION
Safe operation can only be guaranteed if the device is operated in accordance
with chapter 2 Safety and 3 Technical data.
ATTACHMENT PARTS
Attachment parts must always be used!
The separator fill levels must be monitored.
The separators must be emptied regularly (see chapter 2.3.2 Safe operation).
If different vacuum applications are connected, media may mix. This mixture of
media must not endanger persons, the environment and/or equipment!
Checking equipment regularly
Unusual running noises
Ensure all electrical and pneumatic connections are sealed tightly
Check pneumatic connection for tightness
Pneumatic connection free of deposits
Integrity of attachment parts
Operating Manual MXPC 303 Z/603 T
Operation
27