Page 1
CL/INST04 Assembly Instructions * Pro Version shown...
Page 2
Platform - Safety Rail Assembly Platform - Safety Rail Assembly IMPORTANT To avoid assembly problems follow these instructions exactly. Note : If assembling the platform with Folding Safety Rails first read the seperate instructions included with the Folding Safety Rail Bracket Kit. M6 x 45 Patch-Lok Step 1...
Page 3
Platform - Safety Rail Assembly Platform - Safety Rail Assembly NEXT: For PRO Models - Proceed to Rota-Gate Assembly NEXT: For Standard Models - Proceed to Ladder Frame Assembly M6 x 70 Illustration 5 Illustration 6...
Page 4
Rota-Gate Assembly Rota-Gate Assembly IMPORTANT To avoid assembly problems follow these instructions exactly. Step 1 Fasten the Angle Rotating Bracket to the Lower Side Safety Rail at A and B using two M6 x 40mm Bolts and Nyloc Nuts - Finger tight only .
Page 5
Auto-Safe Gate Assembly Auto-Safe Gate Assembly IMPORTANT To avoid assembly problems follow these instructions exactly. Step 1 Remove the M6 x 65mm screw and nyloc nut at A from the LHS Upper Side Safety Rail as viewed from the entry point of the platform and discard. (See illustration No. 1) Step 2 Align the Rear Tab of the Auto-Safe Gate Housing with hole position A in the LH Side Upper Safety Railing.
Page 6
Ladder Frame Assembly Ladder Frame Assembly IMPORTANT To avoid assembly problems follow these instructions exactly. Work Safely - Do not stand the frames upright when assembling. Place the frames in the positions as shown in the illustrations. Step 1 Lay the Rear Frame (without steps) on the floor. Check that the Flat Brace is at the floor level. If not, turn the frame over.
Page 7
Ladder Frame Assembly Ladder Frame Assembly NEXT: Proceed to Tube Brace Assembly. M10 x 20 M10 x 20 Illustration 5 Illustration 6...
Page 8
Tube Brace Assembly Tube Brace Assembly IMPORTANT To avoid assembly problems follow these instructions exactly. Work Safely - Do not stand the frames upright when assembling. Place the frames in the positions as shown in the illustrations. Nylon Spacer Nylon Spacer Instructions for sizes with 4 to 7 steps including the platform Proceed to Control Handle Assembly There are no additional Tube Braces to be fitted to these sizes.
To avoid assembly problems follow these instructions exactly. Work Safely - This assembly is done Centre Hole with the Stockmaster standing upright. Step 1 Stand the Ladder upright. Position the Control Handle in the Step Frame between the 2nd and 3rd steps.
To avoid assembly problems follow these instructions exactly. Work Safely - This assembly is done with the Stockmaster standing upright. Step 1 Fix the Handrail to the Platform Kickrail. Slide the Handrail into the Kickrail and rotate the handrail so that the lower end is over the Step.
Page 11
To avoid assembly problems follow these instructions exactly. Work Safely - This assembly is done with the Stockmaster standing upright. A). Feed the 62mm long flanged bush from the underside of the yellow buffer and through the top of the tube B).
Page 12
Mobilisation Assembly Mobilisation Assembly M12 x 40 M8 x 40 Illustration 3 Illustration 4 Illustration 7 Illustration 8 NEXT: For sizes with 4 to 7 steps incl platform: Proceed to Winch Assembly Instructions NEXT: For sizes with 8 to 14 steps incl platform: Proceed to 2 Piece Mast Assembly Instructions Illustration 5 Illustration 6...
Page 13
2 Piece Mast Assembly 2 Piece Mast Assembly IMPORTANT To avoid assembly problems follow these instructions exactly. Work Safely Instructions for sizes with 12 to 14 steps including the platform: Step 1 On a level surface butt the two Mast sections together. (See illustration No. 1) Step 2 Fix the Large Mast Joining Plate to the two Mast sections using four of the M6 x 16 button head screws - Finger tight only.
Winch Assembly Winch Assembly IMPORTANT To avoid assembly problems follow these instructions exactly. Step 1 On a level surface lay the mast face-down as shown. (See illustration No. 1) Step 2 Remove the Nut from the Winch Shaft at A. Pull out the winch shaft and remove the Sproket. Carefully put the Sproket, Shaft, Nut &...
Chain Settting Chain Setting IMPORTANT To avoid assembly problems follow these instructions exactly. Step 1 Cut and remove the Black Wire Ties at the top of the Mast. Do not cut the Large White Centre Tie (See illustration No. 1) Step 2 Position the Chain around the Sprocket using the Large White Wire Tie.
To avoid assembly problems follow these instructions exactly. Work Safely - This assembly is M6 x 40 done with the Stockmaster standing upright. M8 x 20 Step 1 Lift the Mast into position against the rear of the Platform safety rail and fix thru holes A and B using M6 x 40mm bolts and nyloc nuts.
Page 19
To avoid assembly problems follow these instructions exactly. Work Safely - This assembly is done with the Stockmaster standing upright. Step 1 Position the Carraige Rollers of the Upper and Lower Table Brackets within the side track of the Mast.
Risk Assesment & Warranty RISK ASSESMENT This completes the product assembly. Before use - See the product Risk Assesment at www.stockmaster.co WARRANTY Thank you for choosing Stockmaster your safety is in good hands Register your 2 year warranty online at www.stockmaster.co...
Need help?
Do you have a question about the LiftTruk and is the answer not in the manual?
Questions and answers