Installation Of Control Unit - Cedes cegard/Max C/CM Installation And Operation Manual

Light curtain
Table of Contents

Advertisement

Available languages

Available languages

Installation and operation manual

5.2. Installation of control unit

15 ... 25 VAC
17 ... 240 VAC/DC
15 ... 30 VDC
N
24 V
P
GND
common
common
nc
nc
no
no
GND
GND
Test
Test
© CEDES/May 2012
IP54
IP54
CEDES
CEDES
part No. 102 336 resp. 102 407
part No. 102 336 resp. 102 407
17...240VAC/DC resp. 24 V
17...240VAC/DC resp. 24 V
WAGO 6 x 5.08
250 VAC / 8 A
125 VDC / 0.5 A
30 VDC / 8 A
min. 5 VDC / 10 mA
Switch
JP1
0 ... 10 s (Timer)
R x connector
Tx connector
W ago 2 x 5.08
W ago 6 x 5.08
Potentiom eter
JP1 Jum per
Switch
 Fix the control unit with 4 screws near the door drive
 Connect terminal protective earth PE with low
impedance (< 10 ) to protective earth of the power
supply
 Connect Tx and Rx connector edge to the control
unit.
-
White connector = Tx edge
-
Blue connector = Rx edge
 6-pole orange connector = Power
 2-pole orange connector = Test input
Hold time of relay:
Hold time of the relay can be delayed after the protective
area is free. Delay time is adjustable with the
potentiometer 0 ... 10 s. Default is 0 s.
Jumper JP1:
JP1 set = Criss-cross beam mode on
JP1 off = Criss-cross beam mode off
Buzzer:
Switch On / Off using switch S as desired. Automatic
calibration is activated, if switched 'Off'.
www.cedes.com
cegard/Max C/CM
5

Advertisement

Chapters

Table of Contents
loading

Table of Contents