Wells WDDI-31 Installation And Operating Instructions Manual page 13

Table of Contents

Advertisement

MECHANICAL INSTALLATION
The following is a step-by-step procedure for installation of the Recirculating Hoods.
Un-crate the downdraft unit, being very careful
1.
not to dent or scratch the outer surface.
NOTE: Report any damage to the delivering
2.
freight carrier and file a claim if appropriate.
Check the nameplate on the equipment to make
certain it meets the specifications provided by
the architect and or engineer. If discrepancies
exist, notify the manufacturer immediately.
3. It's important that you have read and understand
"Site Preparation" before continuing with the
installation of the hood.
Determine the exact location of the downdraft
4.
unit.
5.
Place the unit into position.
Complete the assembly of the sneeze guard, on page 6,
6.
to the top of main unit.
Install the side kick plates, with provided screws, to the
7.
main body of the unit.
8.
Install the front and rear kick plates, with provided screws,
to the side kick plate.
Install the inlet filter by placing it in the filter well.
9.
Install the inlet cover by placing it over the inlet filter.
10.
REAR KICK PLATE
SIDE KICK PLATE
REAR KICK PLATE
SIDE KICK PLATE
7
INLET COVER
INLET FILTER
FRONT KICK PLATE
ASSEMBLED
SNEEZE GUARD
INLET COVER
INLET FILTER
FRONT KICK PLATE

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wddi-35

Table of Contents