7705 SAR-Hm and 7705 SAR-Hmc Overview
Step 11. Repackage the router and ship it to the installation site.
Step 12. Perform

3.8.3 On-site Installation

This section applies in any the following installation scenarios:
To install the 7705 SAR-Hm or 7705 SAR-Hmc chassis on site, perform the following
steps in order:
Step 1. Assess and prepare the site. See
Step 2. Unpack the chassis. See
Step 3. Install the SIM. This step is not required if the router has been pre-staged.
Step 4. Install the chassis according to one of the methods described in
Step 5. Ground the chassis. See
Step 6. Install the Main, Diversity, WiFi, and GPS antennas. See
Step 7. Connect the coaxial antenna cables and the network cables to the chassis.
Step 8. Prepare the DC input power cables and connections to the DC power feed.
Step 9. Power up the system. See
80
On-site
• you are using ADP-Hm and have performed the pre-staging steps
• you are using ADP-Hm and are not pre-staging the router
• you are not using ADP-Hm
See
Pre-staging
and Grounding the
Installing and Grounding Outdoor
See
Making Outdoor Antenna and Cable Connections
Connections to the RJ-45
See
Preparing the DC Power
High Voltage Power Supply
© 2022 Nokia. Nokia Confidential Information
Use subject to agreed restrictions on disclosure and use.
SAR-Hm and SAR-Hmc Chassis Installation Guide
Installation.
Site
Unpacking the
in this chapter. See also
Chassis.
Grounding the
Antennas.
Ports.
Connections. If the HV-PS35 is used, see
Unit.
Powering Up and
Preparation.
Chassis.
Installing the
SIM.
Chassis.
Overview
and
Making
Initializing.
3HE 17810 AAAA TQZZA
Installing
or

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

7705 sar-hmc

Table of Contents