Rearload version with standard door ........... 12 CINEO C4080 with 4-cassette RM3 ..........12 CINEO C4080 with 5-cassette RM3 ..........13 CINEO C4080 Gas with 5-cassette RM3 ........14 Rearload version with design door ............15 CINEO C4080 with 4-cassette RM3 ..........15 CINEO C4080 with 5-cassette RM3 ..........
Page 6
Mounting set 01750217971 Safe on installation frame (for CEN safe) ..................... 72 Overview of installation types ..............72 Installation without frame ................73 Installing the installation frame ............. 73 Mounting the device on the installation frame ........80 CINEO C4080 - Installation Guide 01750223447 D...
Page 7
Mounting the frame ............... 138 Wall fixation .................. 140 Mounting the courtesy shelf ..............141 Preparatory work ................141 Courtesy shelf plastic ..............141 CINEO C4080 Rearload with design cover sheet ......142 01750223447 D CINEO C4080 - Installation Guide...
Page 8
Installations specifications with 4-cassette RM3 ......171 Installations specifications with 5-cassette RM3 ......172 Environmental conditions .............. 173 Compliance with standards and certifications ......... 175 Standards met ..................175 Conformity ..................175 Notes concerning radio interference suppression and electrical CINEO C4080 - Installation Guide 01750223447 D...
Page 9
Certification for data transmission ............. 176 FCC rules and Canadian Standard ICES - 003 ......... 176 UL 291, Level 1 (security Container) ..........176 Returning, recycling and disposing of used units and consumables ..................179 01750223447 D CINEO C4080 - Installation Guide...
Page 11
GmbH Limited liability company committee for standardization) Code of Federal Regulation ICES Interference Causing Card Identification Module Equipment Standards (security module) International Protection Canadian Standards Association Line Neutral Protective Earth German Institute for Standardization Data Transmission 01750223447 D CINEO C4080 - Installation Guide...
Page 12
Remote Status Indicator SELV Safety Extra-Low Voltage TN network Power supply network in accordance with EN 60950 Underwriters Laboratories Inc. Uninterruptible Power Supply Association of Property Insurance Companies VIII CINEO C4080 - Installation Guide 01750223447 D...
This installation guide provides all the information you require to plan and prepare installation and to set up the CINEO C4080 (Gas). The CINEO C4080 (Gas) is available in the following versions: The CINEO C4080 with 4-cassette RM3 in the device versions Frontload and Rearload with the safe versions: UL safe...
Remove the shipping restraints inside the unit which secure its components during transportation if necessary for the installation (see enclosed information sheet). General safety precautions This device complies with the relevant safety regulations for information processing equipment. CINEO C4080 - Installation Guide 01750223447 D...
Page 15
During a thunderstorm, data transmission lines must not be connected or disconnected. Always keep the device's vents free from obstruction to ensure proper air circulation and to prevent malfunctions resulting from overheating. 01750223447 D CINEO C4080 - Installation Guide...
Page 16
(e. g. EMA connection, relay panel for external features). To clean and maintain the device only use cleaning agents approved by WINCOR NIXDORF International GmbH (see chapter "Appendix" in the operating manual). Repairs Repair work may only be carried out by authorized personnel.
Page 17
Do not allow the battery to come in contact with water or fire – The battery should only be replaced with the same or an equivalent type recommended by WINCOR NIXDORF International GmbH (see chapter “Appendix,” section “Consumables”). Dispose of used batteries in compliance with national regulations and the manufacturer's specifications.
Planning the installation This chapter provides you with all the information you need to prepare the installation. Device dimensions All dimensions are specified in millimeters (inches). The device views are not drawn to scale. 01750223447 D CINEO C4080 - Installation Guide...
Device dimensions Planning the installation Frontload device version with standard door CINEO C4080 with 4-cassette RM3 678 (26.69") 894 (35.2") 784 (30.87") 900 (35.43") 790 (31.1") 1022 (40.24") 1058 (41.65") * 1 Installation frame * These measures only apply to devices with a barcode reader.
Device dimensions Planning the installation Frontload device version with design door CINEO C4080 with 4-cassette RM3 784 (30.87") 894 (35.2") 790 (31.1") 900 (35.43") 1022 (40.24") 1058 (41.65") * 1108 (43.62") ** 1 Installation frame * These measures only apply to devices with a barcode reader.
Device dimensions Planning the installation Rearload version with standard door CINEO C4080 with 4-cassette RM3 678 (26.69") (3.35") 784 (30.87") 894 (35.2") 900 (35.43") 790 (31.1") 72/43** 1022 (40.24") (2.83")/ (1.69"**) 1058 (41.65") * 1 Installation frame * These measures only apply to devices with a barcode reader.
(see possible installation with frame). When installing a rearload device as a free-standing ATM or when installing the frontload device always contact your insurance company beforehand. In case of doubt contact your Wincor Nixdorf consultant. Possible installation Frontload with Rearload with...
Planning the installation Installation options of device versions Installation without frame (free-standing) Standard door/cover sheet Design door/cover sheet 01750223447 D CINEO C4080 - Installation Guide...
Frame for complete integration with attached logo case CINEO C4080 with 4-cassette RM3 If the CINEO C4080 is installed with a frame for integration in the wall, the unit will not be flush with the wall. This must be taken into account when laying the flooring (see chapter "Installation", section "Installation with...
Page 33
Installation options of device versions CINEO C4080 with 5-cassette RM3 If the CINEO C4080 is installed with a frame for integration in the wall, the unit will not be flush with the wall. This must be taken into account when laying the flooring (see chapter "Installation", section "Installation with...
CINEO C4080 with 4-cassette RM3 If the CINEO C4080 is installed with a frame for integration in the wall, the unit will not be flush with the wall. This must be taken into account when laying the flooring (see chapter "Installation", section "Installation with frame for complete integration").
Page 35
Installation options of device versions CINEO C4080 with 5-cassette RM3 If the CINEO C4080 is installed with a frame for integration in the wall, the unit will not be flush with the wall. This must be taken into account when laying the flooring (see chapter "Installation", section "Installation with...
Wall cutout for installation with frame for complete integration If a CINEO C4080 is to be installed with a frame for complete integration in the wall, a wall cutout must be provided as shown in the figure below. The wall cutout applies for both frames for complete integration with an attached logo case and frames for complete integration without an attached logo chase.
Installation with window frame Window frame with attached logo case Frame for a wall thickness of up to 50 mm max. (1.97") Inside wall (device side) Outside wall * Devices with 5-cassette RM3 01750223447 D CINEO C4080 - Installation Guide...
Page 38
Installation options of device versions Planning the installation Frame for a wall thickness of up to 160 mm max. (6.30") Inside wall (device side) Outside wall * Devices with 5-cassette RM3 CINEO C4080 - Installation Guide 01750223447 D...
Installation options of device versions Window frame without attached logo case Frame for a wall thickness of up to 50 mm max. (1.97") Inside wall (device side) Outside wall * Devices with 5-cassette RM3 01750223447 D CINEO C4080 - Installation Guide...
Page 40
Installation options of device versions Planning the installation Frame for a wall thickness of up to 160 mm max. (6.30") Inside wall (device side) Outside wall * Devices with 5-cassette RM3 CINEO C4080 - Installation Guide 01750223447 D...
Installation options of device versions Wall cutout for installation with window frame If a CINEO C4080 is to be installed with a window frame, a wall cutout must be provided as shown in the figure below. Between the front of the CINEO C4080 and the wall traverse there has to be a distance of at least 20 mm (0.79") because of the air...
Page 42
Installation options of device versions Planning the installation Wall thickness 160 mm (6.3") Inside wall (device side) Outside wall Wall traverse * Devices with 5-cassette RM3 CINEO C4080 - Installation Guide 01750223447 D...
Planning the installation Installation options of device versions Installation with frame for partial integration in the wall Frame for partial integration with attached logo case CINEO C4080 with 4-cassette RM3 01750223447 D CINEO C4080 - Installation Guide...
Page 44
Installation options of device versions Planning the installation CINEO C4080 with 5-cassette RM3 CINEO C4080 - Installation Guide 01750223447 D...
Planning the installation Installation options of device versions Frame for partial integration without attached logo case CINEO C4080 with 4-cassette RM3 01750223447 D CINEO C4080 - Installation Guide...
Page 46
Installation options of device versions Planning the installation CINEO C4080 with 5-cassette RM3 CINEO C4080 - Installation Guide 01750223447 D...
Wall opening for installing the device with a frame for partial integration If a CINEO C4080 is to be installed with a frame for partial integration in the wall, a wall cutout must be provided as shown in the figure below.
Page 48
Installation options of device versions Planning the installation Wall opening for installing the device with a frame for partial integration without attached logo case * Devices with 5-cassette RM3 CINEO C4080 - Installation Guide 01750223447 D...
If interior construction work is not complete when installation is planned, the device must be protected from damage caused by building dust. You may use the plastic packing of the system for this purpose. 01750223447 D CINEO C4080 - Installation Guide...
Necessary operation and maintenance space If the CINEO C4080 is equipped with an ASKIM II DD, there has to be a distance of at least 3 m (9.8 ft) between the electronic article surveillance and the card input of the CINEO C4080.
(see section "Space required for operation and maintenance"). Load-carrying capacity Ensure that the installation site has the required load-carrying capacity. You will find the relevant device weight in the section "Installation specifications" in the chapter "Appendix". 01750223447 D CINEO C4080 - Installation Guide...
CEN standard. In case of a mounting structure other than the one specified in the respective sections "Mounting the installation frame" in the chapter "Installation", always contact your insurance company beforehand. CINEO C4080 - Installation Guide 01750223447 D...
Installation frame Installation frame General A CINEO C4080 cannot be installed without the installation frame. The installation frame is secured to the floor at the attachment points (see section "Drilling diagrams"). Then the device (safe) is screwed to the installation frame.
: Frontload : Rearload There is only the respective number in the key without the superscript letter. The classification to Frontload and Rearload is implied by the illustration. (See illustration on the following page) CINEO C4080 - Installation Guide 01750223447 D...
Page 57
6 Area for cables of installation frame 7 Cable feed openings underneath the installation frame 3 Attachment points of safe 4 Attachment point of tear-off 8 This side must always point sensor towards the customer panel 01750223447 D CINEO C4080 - Installation Guide...
Planning the installation Dimensions of cable areas In the following illustration (see following page) the cable feed openings are dimensioned based on the outer edge of the installation frame. (See illustration on the following page) CINEO C4080 - Installation Guide 01750223447 D...
Page 59
37 (1.46") 25 (0.98") 5 Cable lead-ins in the installation frame 6 Area for cables 7 Cable feed openings underneath the installation frame 8 This side must always point towards the customer panel 01750223447 D CINEO C4080 - Installation Guide...
(see chapter "Installation").The length of the threaded rod depends on the installation frame you use (see chapter "Installation"). No power or data cables may be installed below the RM3 inside the safe. CINEO C4080 - Installation Guide 01750223447 D...
Drilling diagrams The following figures specify the distance from the edge of the different device versions of the drill holes that are used to secure CINEO C4080 (Gas) to the installation frame. The installation frame is 3 mm (0.12") smaller than the safe all around.
Hole for tear-off at least 40 mm (1.57") in concrete. sensor: Ask your alarm technician about the size of the hole and the cartridge. CINEO C4080 - Installation Guide 01750223447 D...
Hole for tear-off at least 40 mm (1.57") in concrete. sensor: Ask your alarm technician about the size of the hole and the cartridge. 01750223447 D CINEO C4080 - Installation Guide...
Hole for tear-off at least 40 mm (1.57") in concrete. sensor: Ask your alarm technician about the size of the hole and the cartridge. CINEO C4080 - Installation Guide 01750223447 D...
You must ensure that connecting cables do not impede or actually damage any moving components. For the dimensions of the cable feed areas please refer to the section "Dimensions of cable feed areas". 01750223447 D CINEO C4080 - Installation Guide...
Power and data cables Planning the installation Cable lead-ins into the safe Frontload 5 Cable lead-in in the installation frame 6 Cable feed through the floor 8 Customer panel side CINEO C4080 - Installation Guide 01750223447 D...
Page 67
No power or data cables may be installed below the RM3 inside the safe. You will also find details of the position of the cable feed opening for the device in the section "Installation frame". 01750223447 D CINEO C4080 - Installation Guide...
Page 68
Power and data cables Planning the installation Rearload 5 Cable lead-in in the installation frame 6 Cable feed through the floor 8 Customer panel side CINEO C4080 - Installation Guide 01750223447 D...
Page 69
No power or data cables may be installed below the RM3 inside the safe. You will also find details of the position of the cable feed opening for the device in the section "Installation frame". 01750223447 D CINEO C4080 - Installation Guide...
The optional remote status indicator comes with a 50 m (164.1 ft) connecting cable. During planning, the position for installation and cable routing must be defined (see also chapter "Installing the remote status indicator"). CINEO C4080 - Installation Guide 01750223447 D...
Planning the installation Dimensions of the frame logo Dimensions of the frame logo If the CINEO C4080 was ordered without a logo, the logo has to be provided by the customer. The visible and the actual logo surface are identical.
Observe the ambient condition requirements for transportation and storage (see chapter "Appendix", section "Technical data"). Due to the shipping crate some dimensions are different (see illustrations below). CINEO C4080 - Installation Guide 01750223447 D...
Page 73
Planning the installation Transport route requirements CINEO C4080 with 4-cassette RM3 610 (24.02") (3.94") 770 (30.31") 72/43** 590 (23.23") (2.83")/(1.69"**) 1022 (40.24") 790 (31.1") 1058 (41.65") * 1 Shipping crate * This measure only applys to devices with a barcode reader.
Page 74
Transport route requirements Planning the installation CINEO C4080 with 5-cassette RM3 610 (24.02") (3.94") 770 (30.31") 590 (23.23") 72/43** 1022 (40.24") 790 (31.1") (2.83")/(1.69"**) 1058 (41.65") * 1 Shipping crate * This measure only applys to devices with a barcode reader.
Page 75
Planning the installation Transport route requirements CINEO C4080 Gas with 5-cassette RM3 610 (24.02") (3.94") 770 (30.31") 590 (23.23") 72/43** 1022 (40.24") 810 (31.89") (2.83")/(1.69"**) 1058 (41.65") * 1 Shipping crate * This measure only applys to devices with a barcode reader.
Page 76
Refer to the next page for an example. 1540 (60.63") * CINEO C4080 Gas CINEO C4080 - Installation Guide 01750223447 D...
Page 77
Planning the installation Transport route requirements Example CINEO C4080 with minimum transport path measurements 830 (32.68") 1540 (60.63") 01750223447 D CINEO C4080 - Installation Guide...
Page 78
Transport route requirements Planning the installation Example CINEO C4080 Gas with minimum transport path measurements 850 (33.46") 1540 (60.63") CINEO C4080 - Installation Guide 01750223447 D...
Removing the packing Remove the packing material of the CINEO C4080. Dispose of the packaging which is no longer needed according to the regulations of your country.
For transportation the device is equipped with a shipping crate. This must be removed before installation. To move the device push against the sides of the safe only as shown in the illustration below. CINEO C4080 - Installation Guide 01750223447 D...
Don't move the device in this situation, it risks to tip over! Remove the shipping crate of CINEO C4080 (Gas) (2). Dispose of the shipping crate which is no longer needed according to the regulations of your country. 01750223447 D CINEO C4080 - Installation Guide...
A caulking gun is not included in the delivery package. Threaded rod M16 x 300 – (DIN 976, property class 8.8) Hexagon nut M16 (DIN 971-1) – Washer A 17 DIN 125-St – CINEO C4080 - Installation Guide 01750223447 D...
Washer A 17 DIN 125-St – Mounting set 01750217972 Safe on installation frame (for UL safe) Item Quantity required Pan head screw M16 x 40 – (DIN 6910, property class 10.9) Washer A 17 ISO 7089-St – 01750223447 D CINEO C4080 - Installation Guide...
Observe the necessary operation and maintenance space for the various types of installation (see section "Space required for operation and maintenance"). The area specified for the installation of the frame requires a short tool (see section "Required operation and maintenance space"). CINEO C4080 - Installation Guide 01750223447 D...
Take note of the alignment of the installation frame. If the mounting set is not provided, use equivalent fastening material. Align the installation frame and mark the holes to be drilled for mounting the installation frame (see illustration below). 01750223447 D CINEO C4080 - Installation Guide...
Page 86
: Frontload : Rearload There is only the respective number in the key without the superscript letter. The classification to Frontload and Rearload is implied by the illustration. (See illustration on the following page) CINEO C4080 - Installation Guide 01750223447 D...
Page 87
4 Attachment point of tear-off 8 This side must always point sensor towards the customer panel. Drill the required four holes and the hole for the tear-off sensor, if necessary (see following figures). 01750223447 D CINEO C4080 - Installation Guide...
Page 88
The drilled hole in the concrete foundation must have a depth of at least 40 mm (1.57") for the tear-off sensor (see illustration below). Consult your alarm technician about the size of the hole and the fixing. CINEO C4080 - Installation Guide 01750223447 D...
Page 89
Excess lengths must be shortened correspondingly or, if necessary in case of deeper floor anchorages, be replaced by equivalent threaded rods. Clean the bore holes as specified in the mounting instructions of the caulking cartridge. 01750223447 D CINEO C4080 - Installation Guide...
Page 90
The space inside the installation frame allows cable lead-in through cable ducts in the floor. Frontload Rearload 5 Cable lead-in in the installation frame 6 Cable feed through the floor 8 Customer panel side CINEO C4080 - Installation Guide 01750223447 D...
Page 91
4 attachment points (2) (for material see section "Mounting set"). If applicable, note the hardening times of the mounting material. The threaded rods must not protrude beyond the installation frame. If necessary, level the threaded rods. 01750223447 D CINEO C4080 - Installation Guide...
(2) to the installation frame (for material see section "Mounting sets"). (1) M16 x 40 / (2) M16 x 40 CEN: (1) M16 x 45 / (2) M16 x 40 CINEO C4080 - Installation Guide 01750223447 D...
Fax the filled out and signed Confirmation of Installation form to the fax number provided on the form. If there is no fax machine available, the form has to be faxed to this number at a later point in time. 01750223447 D CINEO C4080 - Installation Guide...
Installation without frame Installation Give the Confirmation of Installation to the operator of the device. The operator needs the Confirmation of Installation for submitting it to the insurance company. General information Close the device. CINEO C4080 - Installation Guide 01750223447 D...
(see illustration below). If a tear-off sensor is to be installed as agreed with the financial institution or the alarm technician, also mark the holes for the tear-off sensor (see illustrations below). 01750223447 D CINEO C4080 - Installation Guide...
Page 96
A to D. The installation frame is secured with a total of four threaded rods. The superscript letter in the following illustration stands respectively for: : Rearload (See illustration on the following page) CINEO C4080 - Installation Guide 01750223447 D...
Page 97
Attachment point of tear-off 8 This side must always point sensor towards the customer panel 9 Wall Drill the required four holes and the hole for the tear-off sensor, if necessary (see following figures). 01750223447 D CINEO C4080 - Installation Guide...
Page 98
The drilled hole in the concrete foundation must have a depth of at least 40 mm (1.57") for the tear-off sensor (see illustration below). Consult your alarm technician about the size of the hole and the fixing. CINEO C4080 - Installation Guide 01750223447 D...
Page 99
Excess lengths must be shortened correspondingly or, if necessary in case of deeper floor anchorages, be replaced by equivalent threaded rods. Clean the bore holes as specified in the mounting instructions of the caulking cartridge. 01750223447 D CINEO C4080 - Installation Guide...
Page 100
Insert the cartridge for the tear-off sensor if required. The space inside the installation frame allows cable lead-in through cable ducts in the floor. 5 Cable lead-in in the installation frame 6 Cable feed through the floor 8 Customer panel side CINEO C4080 - Installation Guide 01750223447 D...
Page 101
4 attachment points (2) (for material see section "Mounting set"). If applicable, note the hardening times of the mounting material. The threaded rods must not protrude beyond the installation frame. If necessary, level the threaded rods. 01750223447 D CINEO C4080 - Installation Guide...
If it is necessary for the installation remove those parts inside the unit which secure its components during transportation (see enclosed information sheet). Pull out the RM3 (see chapter "Basic Operation" in the operating manual). CINEO C4080 - Installation Guide 01750223447 D...
Replace the filling piece of the installation frame (position 6a) (2) and fix it with the earlier removed screw (3). Replace the filling piece of the safe and fix it with the two screws (4). 01750223447 D CINEO C4080 - Installation Guide...
The operator needs the Confirmation of Installation for submitting it to the insurance company. General information Close the device. Unpack the parts of the installation frame and install them (see the following section). CINEO C4080 - Installation Guide 01750223447 D...
1 sensor at the frame 4 Connection cable for lighting 2 Wall fixation 5 Middle frame plate 3 Cover angle (adjustment only 6 Lower frame plate after the frame is attached to the device) 01750223447 D CINEO C4080 - Installation Guide...
Page 106
1 sensor at the frame 4 Connection cable for lighting 2 Wall fixation 5 Middle frame plate 3 Cover angle (adjustment only 6 Lower frame plate after the frame is attached to the device) CINEO C4080 - Installation Guide 01750223447 D...
Attach the middle frame brackets (position 5 in the illustration "View of the frame (completely assembled)") on the left and on the right side using two round head screws M4x6 each in the lower hole pattern (2). 01750223447 D CINEO C4080 - Installation Guide...
Page 108
(6). Fasten at least one of the previously loosened screws on right, on the left and on top. Frame for complete integration with attached logo case only: Raise the cable of the light box (7) and fix it. CINEO C4080 - Installation Guide 01750223447 D...
Lift the frame a little and slide it carefully over the customer panel and let go. Be careful not to scratch the customer panel and not to damage the connection cable. Push the frame against the wall. 01750223447 D CINEO C4080 - Installation Guide...
Page 110
This could cause the customer panel to grate or jam against the inside of the frame when you open it. Plug the connection cable in the socket on the top cover of the CINEO C4080 (3). CINEO C4080 - Installation Guide 01750223447 D...
Adjustmenting the cover angle Adjust the cover angle inside of the frame to compensate mounting tolerances of the installation frame. Then the cover angle is screwed to the traverse inside of the device. 01750223447 D CINEO C4080 - Installation Guide...
Page 112
Installation with frame for complete integration in wall Installation Loosen the screws (1) and (2) of the cover angle (3). CINEO C4080 - Installation Guide 01750223447 D...
Page 113
(Silicone is not included in the shipment!) 01750223447 D CINEO C4080 - Installation Guide...
(see illustration below). If a tear-off sensor is to be installed as agreed with the financial institution or the alarm technician, also mark the holes for the tear-off sensor (see illustrations below). CINEO C4080 - Installation Guide 01750223447 D...
Page 115
A to D. The installation frame is secured with a total of four threaded rods. The superscript letter in the following illustration stands respectively for: : Rearload (See illustration on the following page) 01750223447 D CINEO C4080 - Installation Guide...
Page 116
6 Area for cables of installation frame 7 Cable feed openings underneath the installation frame Attachment points of safe Attachment point of tear-off 8 This side must always point sensor towards the customer panel. 9 Wall CINEO C4080 - Installation Guide 01750223447 D...
Page 117
Attachment point of tear-off 8 This side must always point sensor towards the customer panel. 9 Wall Drill the required four holes and the hole for the tear-off sensor, if necessary (see following figures). 01750223447 D CINEO C4080 - Installation Guide...
Page 118
The drilled hole in the concrete foundation must have a depth of at least 40 mm (1.57") for the tear-off sensor (see illustration below). Consult your alarm technician about the size of the hole and the fixing. CINEO C4080 - Installation Guide 01750223447 D...
Page 119
Excess lengths must be shortened correspondingly or, if necessary in case of deeper floor anchorages, be replaced by equivalent threaded rods. Clean the bore holes as specified in the mounting instructions of the caulking cartridge. 01750223447 D CINEO C4080 - Installation Guide...
Page 120
Insert the cartridge for the tear-off sensor if required. The space inside the installation frame allows cable lead-in through cable ducts in the floor. 5 Cable lead-in in the installation frame 6 Cable feed through the floor 8 Customer panel side CINEO C4080 - Installation Guide 01750223447 D...
Page 121
4 attachment points (2) (for material see section "Mounting set"). If applicable, note the hardening times of the mounting material. The threaded rods must not protrude beyond the installation frame. If necessary, level the threaded rods. 01750223447 D CINEO C4080 - Installation Guide...
If it is necessary for the installation remove those parts inside the unit which secure its components during transportation (see enclosed information sheet). Pull out the RM3 (see chapter "Basic Operation" in the operating manual). CINEO C4080 - Installation Guide 01750223447 D...
Replace the filling piece of the installation frame (position 6a) (2) and fix it with the earlier removed screw (3). Replace the filling piece of the safe and fix it with the two screws (4). 01750223447 D CINEO C4080 - Installation Guide...
The operator needs the Confirmation of Installation for submitting it to the insurance company. General information Close the device. Unpack the parts of the installation frame and install them (see the following section). CINEO C4080 - Installation Guide 01750223447 D...
With an attached logo case and wall thickness up to 50 mm (1.96") 1 sensor at the frame 4 Connection cable for lighting 2 Wall fixation 5 Frame bracket 3 Cover angle (adjustment only 6 Window crossbar after the frame is attached to the device) 01750223447 D CINEO C4080 - Installation Guide...
Page 126
With an attached logo case and wall thickness up to 160 mm (6.30") 1 sensor at the frame 4 Connection cable for lighting 2 Wall fixation 5 Frame bracket 3 Cover angle (adjustment only 6 Window crossbar after the frame is attached to the device) CINEO C4080 - Installation Guide 01750223447 D...
Page 127
Without an attached logo case and wall thickness up to 50 mm (1.96") 1 sensor at the frame 4 Connection cable for lighting 2 Wall fixation 5 Frame bracket 3 Cover angle (adjustment only 6 Window crossbar after the frame is attached to the device) 01750223447 D CINEO C4080 - Installation Guide...
Page 128
Without an attached logo case and wall thickness up to 160 mm (6.30") 1 sensor at the frame 4 Connection cable for lighting 2 Wall fixation 5 Frame bracket 3 Cover angle (adjustment only 6 Window crossbar after the frame is attached to the device) CINEO C4080 - Installation Guide 01750223447 D...
(5). Push the cover angle (3) as far as possible in the direction of the arrow (6). Fasten at least one of the previously loosened screws on right, on the left and on top. 01750223447 D CINEO C4080 - Installation Guide...
Page 130
Installation with window frame Installation Window frame with attached logo case only: Raise the cable of the light box (7) and fix it. CINEO C4080 - Installation Guide 01750223447 D...
Be careful not to scratch the customer panel and not to damage the connection cable. Push the frame against the wall. Close the customer panel (see operating manual). 01750223447 D CINEO C4080 - Installation Guide...
Plug the connection cable in the socket on the top cover of the CINEO C4080 (3). Wall fixation After you installed the frame into the wall, you need to fix the wall on its rear side. CINEO C4080 - Installation Guide 01750223447 D...
Adjustmenting the cover angle Adjust the cover angle inside of the frame to compensate mounting tolerances of the installation frame. Then the cover angle is screwed to the traverse inside of the device. 01750223447 D CINEO C4080 - Installation Guide...
Page 134
Installation with window frame Installation Loosen the screws (1) and (2) of the cover angle (3). CINEO C4080 - Installation Guide 01750223447 D...
Page 135
(Silicone is not included in the shipment!) 01750223447 D CINEO C4080 - Installation Guide...
(see illustration below). If a tear-off sensor is to be installed as agreed with the financial institution or the alarm technician, also mark the holes for the tear-off sensor (see illustrations below). CINEO C4080 - Installation Guide 01750223447 D...
Page 137
: Frontload : Rearload There is only the respective number in the key without the superscript letter. The classification to Frontload and Rearload is implied by the illustration. (See illustration on the following page) 01750223447 D CINEO C4080 - Installation Guide...
Page 138
4 Attachment point of tear-off 8 This side must always point sensor towards the customer panel 9 Wall Drill the required four holes and the hole for the tear-off sensor, if necessary (see following figures). CINEO C4080 - Installation Guide 01750223447 D...
Page 139
The drilled hole in the concrete foundation must have a depth of at least 40 mm (1.57") for the tear-off sensor (see illustration below). Consult your alarm technician about the size of the hole and the fixing. 01750223447 D CINEO C4080 - Installation Guide...
Page 140
Excess lengths must be shortened correspondingly or, if necessary in case of deeper floor anchorages, be replaced by equivalent threaded rods. Clean the bore holes as specified in the mounting instructions of the caulking cartridge. CINEO C4080 - Installation Guide 01750223447 D...
Page 141
The space inside the installation frame allows cable lead-in through cable ducts in the floor. Frontload Rearload 5 Cable lead-in in the installation frame 6 Cable feed through the floor 8 Customer panel side 01750223447 D CINEO C4080 - Installation Guide...
Page 142
4 attachment points (2) (for material see section "Mounting set"). If applicable, note the hardening times of the mounting material. The threaded rods must not protrude beyond the installation frame. If necessary, level the threaded rods. CINEO C4080 - Installation Guide 01750223447 D...
If it is necessary for the installation remove those parts inside the unit which secure its components during transportation (see enclosed information sheet). Pull out the RM3 (see chapter "Basic Operation" in the operating manual). 01750223447 D CINEO C4080 - Installation Guide...
Replace the filling piece of the installation frame (position 6a) (2) and fix it with the earlier removed screw (3). Replace the filling piece of the safe and fix it with the two screws (4). CINEO C4080 - Installation Guide 01750223447 D...
The operator needs the Confirmation of Installation for submitting it to the insurance company. General information Close the device. Unpack the parts of the installation frame and install them (see the following section). 01750223447 D CINEO C4080 - Installation Guide...
View of the frame (completely assembled) With attached logo case 1 sensor at the frame 5 Middle frame plate 2 Cover angle 6 Lower frame plate 3 Wall fixation 7 Mounting brackets 4 Connection cable for lighting CINEO C4080 - Installation Guide 01750223447 D...
Page 147
Installation with frame for partial integration in the wall Without attched logo case 1 Right part of frame 5 Middle frame plate 2 Left part of frame 6 Lower frame plate 3 Top part of frame 7 Mounting brackets 01750223447 D CINEO C4080 - Installation Guide...
M4 x 6 (1). Frame for partial integration with/without attached logo case Attach the upper mounting brackets (position 7 in the illustration "View of the frame (completely assembled)") with two countersunk screws M 4x6 (3). CINEO C4080 - Installation Guide 01750223447 D...
Page 149
M4x6 each in the lower hole pattern (3). Attach the lower frame brackets (position 6 in the illustration "View of the frame (completely assembled)") on the left and on the right side using two round head screws M4x6 each (4). 01750223447 D CINEO C4080 - Installation Guide...
Push the frame from the front in the direction of the arrow (1) up to the customer panel. Lift the frame a little and slide it carefully over the customer panel and let go. Be careful not to scratch the customer panel. Push the frame against the wall. CINEO C4080 - Installation Guide 01750223447 D...
Page 151
Frame for partial integration with attached logo case only: Plug the connection cable in the socket on the top cover of the CINEO C4080 (4). 01750223447 D CINEO C4080 - Installation Guide...
After you installed the frame into the wall, you need to fix the wall on its rear side. Loosen screws (1) and (2). Move the two wall fixations as fas as possible outward (3). Fasten the screws (1) and (2) again. CINEO C4080 - Installation Guide 01750223447 D...
The installation procedure is described for a CINEO C4080 Rearload with design cover sheet as an example, the procedure is the same for a CINEO C4080 Frontload with design cover sheet. Any deviations are specifically described at the respective position.
CINEO C4080 Rearload (see previous section). Attach the courtesy shelf using two pan head screws M6x30 (1). Close the front door of the CINEO C4080 Frontload or replace the front cover sheet of the CINEO C4080 Rearload and fasten the screw in the protection plate.
Seismic vibration detector installation A certain preparation is mandatory for the installation for a seismic vibration detector into a CINEO C4080. This preparation can be deliviered from the factory as an option. Without this preparation is a correct functioning of the seismic vibration detector not given.
Open the CINEO C4080 and pull the printer carriage as far as possible out of the UPS (for its position in the CINEO C4080 please refer to the chapter "Device Overview", for its accessability to the chapter "Basic Operation"...
Page 157
Remove the housing cover aside (2). Connect the plug connection (1). Reinstall the housing cover on the left (1) and press it against the UPS on the right until it locks into position. 01750223447 D CINEO C4080 - Installation Guide...
Phillips screws SPAX 2.5 x 20 mm (0.098" x 0.787" ) (countersunk head) Fixings Ø 4 mm (0.16") The enclosed mounting material is used to secure the indicator to masonry or wooden paneling. 01750223447 D CINEO C4080 - Installation Guide...
Drill the necessary bores: drill depth: 20 mm (0.79"), drill diameter: 4 mm (0.16"), and insert the enclosed fixings in the holes. Secure the lower section to the wall with the enclosed screws and press the front cover onto the lower section. CINEO C4080 - Installation Guide 01750223447 D...
Marking on wires The wires are marked with an adhesive label at the end as follows: - 11 RED LIGHT WHITE - 12 YELLOW LIGHT GREEN - 13 GREEN LIGHT BLACK - 14 GND 01750223447 D CINEO C4080 - Installation Guide...
Page 162
Connect the individual wires to the relay panel for external features as follows: 11 121314 Name Wire 'RED - 11 RED LIGHT' Wire 'WHITE - 12 YELLOW LIGHT' Wire 'GREEN - 13 GREEN LIGHT' Wire 'BLACK - 14 GND' Close the device. CINEO C4080 - Installation Guide 01750223447 D...
Phillips screws SPAX 4 x 40 mm (0.157" x 1.575" ) (half-round screws) Fixings Ø 6 mm (0.24") The enclosed mounting material is used to secure the indicator to masonry or wooden paneling. 01750223447 D CINEO C4080 - Installation Guide...
(approx. 20 mm (0.79")). In masonry only: Drill the necessary bores: drill depth: 40 mm (1.57"), drill diameter: 6 mm (0.24"), and insert the enclosed fixings in the holes. CINEO C4080 - Installation Guide 01750223447 D...
Page 165
Remove the required label (1) and apply it to the space provided (2) on the audio remote status indicator. Lay the connecting cable of the audio Remote Status Indicator to the appropriate device. 01750223447 D CINEO C4080 - Installation Guide...
Marking on wires The wires are marked with an adhesive label at the end as follows: - 11 RED LIGHT WHITE - 12 YELLOW LIGHT GREEN - 13 GREEN LIGHT BLACK - 14 GND CINEO C4080 - Installation Guide 01750223447 D...
Page 167
Connect the individual wires to the relay panel for external features as follows: 11 121314 Name Wire 'RED - 11 RED LIGHT' Wire 'WHITE - 12 YELLOW LIGHT' Wire 'GREEN - 13 GREEN LIGHT' Wire 'BLACK - 14 GND' Close the device. 01750223447 D CINEO C4080 - Installation Guide...
Use a screwdriver to press carefully through openings (1) and (2) until the tabs behind them disengage. Remove the front cover (3) forwards. Release the four terminals of the terminal strip (1) and remove the front cover. CINEO C4080 - Installation Guide 01750223447 D...
Page 169
Marking on wires The wires are marked with an adhesive label at the end as follows: - RED LIGHT WHITE - YELLOW LIGHT GREEN - GREEN LIGHT BLACK - GND 01750223447 D CINEO C4080 - Installation Guide...
Page 170
Wire 'RED - RED LIGHT' Wire 'WHITE - YELLOW LIGHT' Wire 'GREEN - GREEN LIGHT' Wire 'BLACK - GND' Press the front cover onto the lower section. Ensure that no wires are damaged in the process. CINEO C4080 - Installation Guide 01750223447 D...
Loosen screw (1). Move the back panel (2) to one side at the bottom and pull the panel downwards out of the front cover. Remove the two screws (1) and move the board (2) to one side. 01750223447 D CINEO C4080 - Installation Guide...
Page 172
Shorten the cable end as shown in the following diagram. You must strip approx. 25 mm (0.98") of the cable insulation and 4.5 mm (0.98") (0.18") of the individual wire insulation. The individual wire ends must be (0.18") twisted. CINEO C4080 - Installation Guide 01750223447 D...
Page 173
Wire 'GREEN - GREEN LIGHT' Wire 'BLACK - GND' Press the connecting cable with the spacer into the cable guide (2). Mount the board and the back panel as described above under removal. 01750223447 D CINEO C4080 - Installation Guide...
Page 174
Shortening the cables Installing the Remote Status Indicator CINEO C4080 - Installation Guide 01750223447 D...
"Notes concerning installation preparation" for your convenience if you want to note any questions or drafts. After checking off all items, copy this list, send it to your head of operations and make arrangements for an installation date. Name: Telephone number: Fax number: 01750223447 D CINEO C4080 - Installation Guide...
Is the securing of cash-dispensers in the raw concrete ensured (CEN standard)? Is the frame aligned and fastened in accordance with the installation instructions? Has a wall cutout that may be required been completed? Are the ambient conditions met? CINEO C4080 - Installation Guide 01750223447 D...
Have you discussed the diameter of the hole that is to be drilled and the fixing to be used for the tear-off sensor with the local alarm provider? Diameter? Fixing to be used? 01750223447 D CINEO C4080 - Installation Guide...
Screed/concrete Carpet Raised floor Marble floor Tiles Others Please enter the width of the most narrow door Please enter the width of the most narrow hallway Checked by customer: Checked by installation technician: CINEO C4080 - Installation Guide 01750223447 D...
Appendix Check list for installation preparations for self-service systems Notes concerning installation preparation 01750223447 D CINEO C4080 - Installation Guide...
Page 180
Check list for installation preparations for self-service systems Appendix CINEO C4080 - Installation Guide 01750223447 D...
Network type: TN (network with PE TN (network with PE conductor) conductor) Permissible tolerance for rated voltage: -10 % to +6% -10 % to +6% Permissible tolerance for rated frequency: ±1 % ±1 % 01750223447 D CINEO C4080 - Installation Guide...
Degree of protection in IP20 IP20 acc. with EN 60529: * If a UPS is used and generally if the device is delivered with sidecar, the CINEO C4080 must be connected with a CEE plug only. CINEO C4080 - Installation Guide 01750223447 D...
* Weight figures refer to the empty weight of the device and the free- standing installation type. Detailed information regarding the dimensions can be found in the "Installation Planning" chapter, under "Machine dimensions". 01750223447 D CINEO C4080 - Installation Guide...
* Weight figures refer to the empty weight of the device and the free- standing installation type. Detailed information regarding the dimensions can be found in the "Installation Planning" chapter, under "Machine dimensions". CINEO C4080 - Installation Guide 01750223447 D...
Transport (in All types of commercial vehicles and trailers original packaging) as well as rail and air transport Storage (in original Noticeable vibration and shocks, e.g. by packaging) machines or passing vehicles 01750223447 D CINEO C4080 - Installation Guide...
Page 186
(e.g. sound protection walls etc.). They must comply with the environmental conditions that apply to the specific device (see above) and the maintenance areas (see chapter "Planning the Installation", section "Space required for operation and maintenance"). CINEO C4080 - Installation Guide 01750223447 D...
Heinz-Nixdorf-Ring 1 33106 Paderborn Germany Notes concerning radio interference suppression and electrical safety All other devices connected to this product must comply with the EMC Directive 89/336/EEC including amending directive 93/68/EEC (as of 01750223447 D CINEO C4080 - Installation Guide...
4 feet by 8 feet by ½ inch thick (1.22 m by 2.44 m by CINEO C4080 - Installation Guide 01750223447 D...
Page 189
12.7 mm thick) or an equivalent structure so as to restrict the removal of the teller machine from the building. The release mechanism of the attachment devices shall only be accessible when the door of the security container is open. 01750223447 D CINEO C4080 - Installation Guide...
Page 190
(where relevant complying with vendor specifications). Labels on plastic case parts Please do not stick any labels on plastic case parts since that would make recycling more difficult. CINEO C4080 - Installation Guide 01750223447 D...
Compliance with standards and certifications Returning, recycling and disposing of used units and consumables Details regarding the return and recycling of used units and consumables can be obtained from your local branch office . 01750223447 D CINEO C4080 - Installation Guide...
Page 192
Compliance with standards and certifications Appendix CINEO C4080 - Installation Guide 01750223447 D...
Page 193
Notes 01750223447 D CINEO C4080 - Installation Guide...
Page 194
Published by WINCOR NIXDORF International GmbH D-33094 Paderborn Order No.: 01750223447 D...