Part List of Model#JIT-1333M (L10.0xW4.0xH3.7m)
Page 6
Base Flange. both ends and sides of the building to the dimensions shown in Figure The Shelter must be secured to a 2. The outline of the strings will firm surface that can receive and represent the final location of the retain stake pegs firmly in position.
Page 10
Then make the cuts using Then make the cuts using Before inserting the cover tensioning forfex along the outlines. forfex along the outlines. tube(part #22) into pocket of roof cover, you need to make cuts for band of Ratchet on the cover first. Firstly please draw the outline of the cuts according to the position of Ratchet.