SS202010 W6.0xL6.0xH3.0m RECOMMENDED TOOLS Please read instructions COMPLETELY before assembly. This shelter MUST be securely anchored. THIS IS A TEMPORARY STRUCTURE AND NOT RECOMMENDED AS A PERMANENT STRUCTURE. Before you start: 2+ individual recommended for assembly, approximate time 3 hr.
PROPER ANCHORING OF THE FRAME IS THE RESPONSIBILITY OF THE CONSUMER. We are not responsible for damage to the unit or the contents from acts of nature. Any shelter that is not anchored securely has the potential to fly away causing damage, and is not covered under the warranty. Periodically check the anchors to ensure stability of shelter.
Page 3
Double Carport 202010 (6.0x6.0x3.0m) Parts List Parts Parts Name Illustration Q'ty Code Roof Bent Joist Roof Straight Joist(Left) Roof Straight Joist(Right) Sidewall Bent Joist Upright for front and back Middle Uprights Top Support Tube Purlin Sidewall Bracing Tube Base Plate for four corners (with winch) U-shaped Anchor Page 3...
Page 4
Bolt M8*70 32+2 Bolt M8*60 64+5 Bolt M6*45 L Shape anchors Stake Pegs M12*450 Knitting Rope for Roof Cover 1bundle Cable Tie for Roof Cover Cable Tie for Front and Back Cover Pull Rod Roof Cover Front Cover Back Cover Wrench Wrench Page 4...
INSTALLATION PROCESS 1. Frame Installation- First Arch (front end) 2. Frame Installation- Middle Arches Page 5...
Page 6
3. Frame Installation- Purlins, Roof and Sidewall Bracing Tubes, Base Plates and Anchors Page 6...
Page 7
4. Cover Installation Use ropes No.16 and cable tie No.17 for fixing the front and back edge to the arches, then fasten the band inside the end of roof cover, makes the cover well folded to frame and insert it to winch on Base Plate at four corners (No.9). Drive the winch forth and back and then roof cover is tightened.
Page 8
5.Front and Back Cover Installation Page 8...
Page 9
Different Way of Roll up Door Now congratulations on the fulfillment of your assembly. Page 9...
Need help?
Do you have a question about the SS202010 and is the answer not in the manual?