Download Print this page

PROBOIL .3 Conversion Manual page 4

Advertisement

Key
Qty
A1
1
A2
1
A3
1
A4
1
A5
2
A6
1
A7
1
A8
1
A9
1
A10
1
A11
1
A12
1
A13
1
A14
1
B1
1
B2
1
B3
1
B4
1
B5
0
B6
1
B7
1
B8
1
B9
1
C1
1
C2
1
C3
1
C4
1
C5
1
C6
2
C7
1
C8
1
C9
1
C10 (E)
Part of C8
C11
Part of C8
C12
1
C13
1
D1
0
D2
1
D3
1
E1
0
E2
1
E3
1
E4
1
E5
1
E6
1
E7
0
E8
1
E9
1
PROBOIL3 conversation to PROBOIL4E guide v1b
Description
Boiler unit
1.5m Power lead
Boiler mounting bracket
Boiler bracket to base unit screw
Boiler bracket screw
Data connection lead
½" Safety / steam / overflow vent outlet
3/8" Hot water outlet
¾" Filtered water inlet
Screw – front panel
Front panel
Drain valve
½" BSPF x ¼" push fit
¼" tube (drain)
1 ½" x 3" Waste extension piece (for use with one bowl sinks only)
1 ½" x 1 ½" x 22mm Waste tee
22mm Olive
Plastic compression nut
22mm copper pipe with elbow, installer fabricated to suit.
Plastic compression nut
22mm Olive
½" x 22mm Tundish
½" x ½" Vent hose
¾" BSP x 3/8" push fit
3/8" x 600mm tube (thicker tube type)
Filter head (includes check valve)
Flush / Drain pipe
Filter cartridge
Filter head screws
3/8" stem x ¼" push fit
¼" x 1500mm Tube (thinner tube type)
¼" x ¼" x ¼" Push fit equal tee
¼" x 1500mm Tube (cut to length as required from C8)
(Note: Part (C10) is referred to as (E) in the 'PROBOIL.4E User & Installation Guide'.
¼" x 1500mm Tube (cut to length as required from C8)
¼" NPTF x ¼" Push fit connector
¾ BSPF x ¼"" push fit
15mm copper pipe
15mm Compression nut
15mm Compression olive
15mm copper pipe
15mm Compression nut
15mm Compression olive
½" (15mm) x ½" (15mm) x ¾" 3 way isolating tee
15mm Compression olive
15mm Compression nut
15mm copper pipe
15mm Compression nut
15mm Compression olive
Page 4

Advertisement

loading

This manual is also suitable for:

Proboil.4e