Auger Assembly - Land Pride SA35 Operator's Manual

Hydraulic post hole digger
Hide thumbs Also See for SA35:
Table of Contents

Advertisement

Section 1: Assembly & Set-up
Kubota CTL Note:
If attaching to Kubota CTL, thread hoses through
Kubota's Hose Stay Kit #S6689. Hose Stay Kit can be
purchased through your nearest Kubota Dealer.
Male Coupler
If Mounted,
Remove Spring
Hose Loop
Hose Bracket
Left Port
Open End Of Hitch Plate
Right Port
(Typical Both Ends Of Hitch Plate)
Option 1 Hose Routing
Figure 1-5
Hydraulic hoses may be routed one of two ways:
Option 1 - Refer to Figure 1-5:
a. If mounted, remove spring hose loop from hitch
plate to facilitate accessing Skid Steer cab.
b. Thread hydraulic hoses down through hose
bracket and out through open end of hitch plate.
Option 2 - Refer to Figure 1-6:
Thread hydraulic hoses up through hose bracket
and then through spring hose loop as shown.
3. Thread hoses through any hose holders that may be
provided on the machine operating the Auger. If
attaching to Kubota CTL, thread hoses through Hose
Stay Kit #S6689. Kubota Hose Stay Kit can be
purchased through your nearest Kubota Dealer. See
your Skid Steer/Tractor Operator's Manual for
instruction on how to use these hose holders.
4. Connect male and female couplers to the
Skid Steer/Tractor high pressure outlets.
5. Make sure hoses are kept away from all pinch points
and then zip tie hoses together as needed. Two zip
ties are provided for this purpose.
6. Operate Skid Steer/Tractor to check auger rotation.
The auger should rotate clockwise when looking
down from above. If auger rotates counterclockwise,
switch male and female couplers on the hydraulic
hoses and then reconnect hoses to the outlets.
7. Also see Hydraulic Hook-up instructions in your Skid
Steer/Tractor Operator's Manual.
12/17/14
Table of Contents
Female Coupler
Zip Ties
33083

Auger Assembly

Refer to Figure 1-6:
NOTE: Augers are supplied with either a 2 9/16" dia.
round hub or 2" hex hub. Make sure gearbox output
shaft matches the auger hub.
1. Position mounting holes in auger tube (#3) in line
with hole in gearbox output shaft (#4).
2. Slide auger tube (#3) over gearbox output shaft (#4)
and install:
Round Hub - 7/8"-9 x 5" GR5 cap screw (#1) and
nylock nut (#2).
Hex Hub - 3/4"- 10 x 4 1/2" GR5 cap screw (#1) and
nylock nut (#2).
3. Tighten hardware to proper torque.
Male Coupler
Spring Hose
Loop
Right Port
Clockwise Rotation
Auger Screw Assembly With Option 2 Hose Routing
Figure 1-6
Model SA35 Hydraulic Post Hole Digger 317-093M
Female Coupler
Zip Ties
Top Angle
Bar
Hose Bracket
Left Port
19232
9

Advertisement

Table of Contents
loading

Table of Contents