Download Print this page

Intex 26PO Owner's Manual page 2

Advertisement

Available languages

Available languages

Boston Valve:
1. Double valve cap (valve lets air in; not out).
2. Quick deflation cap.
3. Unscrew Double Valve cap.
4. Insert output end of air pump into valve and fill. Do not over inflate or use high pressure compressor.
5. To deflate: Unscrew quick-deflation cap.
CAUTION: Double-Valve does not operate when this cap is off. Do not unscrew this cap while product
is in water.
2
1
Anchor bag installation:
1. Inflate and assemble the floating structure first.
2. Place the assembled structure on the water.
3. Thread the long rope through the grommets on the anchor bag.
4. The anchor bag holds about 4 to 6kg (9 to 13lb) of dead weight. Do not exceed the recommended
weight.
5.
For the dead weight, it is recommended to use pebbles or other similar rounded stones of about 1 to
2 inches (2.54 to 5 cm) in size or diameter. IMPORTANT: Never use rough stones or stones with
sharp edges or corners, as they may cause serious injury and damage the anchor bag.
6.
Sand and other fine particles are not recommended as dead weight, they may fall or spill out easily
from the bag, serious injury and property damage may occur.
7.
Clean the pebbles with a garden hose before placing the pebbles into the anchor bags. You may
wish to put the pebbles into a plastic carry bag first and then into the anchor bag.
8.
Close the anchor bag with the end of the rope. Pull the rope tightly and tie a knot as you would tie
shoelaces.
9.
Make sure the anchor bag is securely close and tight. Slowly place the anchor bag on top of the
inflatable structure.
10. Once the inflatable structure is at the desired location, slowly lower the anchor bag into the water until
the anchor bag sits on the floor.
11. Tie the other free end of the rope to the grommet located on the side of the inflatable structure.
The anchor bag must be resting on the floor, the rope must be taut and the inflatable structure should
be floating parallel to the water surface.
Re-boarding Pad Installation (Certain Models):
1.
Make sure the main structure and the re-boarding pad are inflated first.
2.
Match the rope holders on the re-boarding pad with the
rope holders on the rear side of the main structure.
3.
Thread one end of the accessory line through the rope
holders on the re-boarding pad and the rear side of the
main structure. Tie the two loose ends in a square knot
making sure the re-boarding pad is contact with the main
structure.
4.
Repeat the previous step with the other rope holders.
Grab Line and Accessory Line Installation (Certain Models):
Your product may have accessory lines to install. Tie a figure eight knot
into one end of the accessory line and slide it through the rope holders.
Tie a figure eight knot in the remaining end of the rope.
SAVE THESE INSTRUCTIONS
(26PO) EN ISO25649 FUN ISLANDS ENGLISH 4.875" X 7.25" 04/27/2019
3
Page 2
4
5
Square knot
Figure eight knot
26PO

Advertisement

loading