Page 1
MANUFACTURERS: Signode, Signode Canada, Acme Packaging, Fleetwood and Cyklop. TECHNICAL ISSUE ADDRESSED There is a possible crush point on both the PSD-109 and PSD-119 strapping dispensers where the dancer arm comes into close proximity to the dispenser’s “positive stop” area. A guard has been designed to cover the possible crush point.
Page 2
(POWER STRAPPING MACHINE DIVISION) DISPENSER GUARD INSTALLATION (ESTIMATED INSTALLATION TIME - 15 MINUTES) PSD-109 & PSD-119 DISPENSERS: 1. Before installing the guard, follow your plant's lockout/tagout procedures for securing and isolating all power sources to the dispenser. 2. Attach internal warning sign as shown on guard side of post. Subsequently, the guard will cover sign.
Page 3
(POWER STRAPPING MACHINE DIVISION) DISPENSER GUARD INSTALLATION (ESTIMATED INSTALLATION TIME - 15 MINUTES) PSD-109 & PSD-119 DISPENSERS (Continued): 5. Attach external warning sign as shown. 6. Confirm that equipment is "all clear" and then reconnect power in accordance with the plant's lockout/tagout procedures.
Need help?
Do you have a question about the PSD-109 and is the answer not in the manual?
Questions and answers