Installation Of The Baffle; Wiring Work - Gree GMV-ND100L/A-T Owner's Manual

Multi vrf floor standing indoor unit
Hide thumbs Also See for GMV-ND100L/A-T:
Table of Contents

Advertisement

Models
GMV-ND100L/A-T
GMV-ND140L/A-T

4.6 Installation of the Baffle

Please install it after installation of connection pipe and drainage pipe
according to Fig 4.7.
(1)
Loosen the screws and adjust the baffle position up and down to clamp
connection pipe/drainage pipe as much as possible.
(2)
Tighten the screws.

5 Wiring Work

NOTES!
① Units must be earthed securely, or it may cause electric shock.
② Please read the wiring diagram carefully before carry out the wiring work,
incorrect wiring could cause malfunction or even damage the unit.
③ The unit should be powered by independent circuit and specific socket.
④ The wiring should be in accordance with related regulations in order to
ensure the units reliable running.
⑤ Install circuit breaker for branch circuit according to related regulations
and electrical standards.
⑥ Keep cable away from refrigerant pipings, compressor and fan motor.
⑦ The communication wires should be separated from power cord and
connection wire between indoor unit and outdoor unit.
⑧ Adjust the static pressure via wired controller according to site
circumstance.
Gas Pipe(mm/inch)
Φ15.9
Φ15.9
Fig 4.7
12
Multi VRF Floor Standing Indoor Unit
Liquid pipe(mm/inch)
5/8
Φ9.52
5/8
Φ9.52
3/8
3/8