Test Equipment Cards - ADC DSXpert 2005R Installation Instructions Manual

Table of Contents

Advertisement

ADCP-80-421 • Issue 1 • October 2001
16862-A
Figure 14. Installing CPU Card
The NORM/ALM LED should blink green after the power-up sequence is complete and no
alarm condition is present. The PS1 and PS2 LEDs should be a steady green.
2.2.2

Test Equipment Cards

The slot marked TST located in the middle of the chassis both front and rear is dedicated to the
Test Card.
Refer to work order to determine if Test Cards are being used. Install Test Cards as shown in
Figure 15
and
Figure
16.
Secure module in the chassis by tightening the screws at the top and bottom of the module.
The Test Equipment Card has one green LED (labeled TST1). When operting properly the LED
is illuminated green.
Page 11
© 2001, ADC Telecommunications, Inc.

Advertisement

Table of Contents
loading

Table of Contents