Assembly - Ranger RD-20SE Installation And Operation Manual

Rolling air evacuation oil drain
Table of Contents

Advertisement

Assembly

Complete the assembly of your Rolling Air Evacuated Oil Drain by following the instructions below.
1. Insert the four Casters in the Caster Brackets at the bottom of the Tank and secure with the
Retaining Rings.
2. Thread the 2" Base Nipple into the Oil Transfer Valve on top of the Tank.
hand tight, do not use a wrench to tighten
3. Verify the Oil Transfer Valve is fully open, (Valve handle is vertical) then Insert the Drain Tube into
the 2" Nipple.
4. Slide the Drain Tube Lock washer onto the Drain Tube (tab end down) as pictured below.
5. Insert the Funnel into the Drain Tube and secure using the Setscrew on the side of the Drain Tube.
6. Place the Receiver Screen in the recessed area inside of the Funnel.
7. Attach the female Quick Coupler onto the end of the Oil Discharge Hose.
RD-20SE Rolling Air Evacuated Oil Drain
.
7
P/N 5900327 — Rev. A — February 2022
This Nipple should be

Advertisement

Table of Contents
loading

Table of Contents