Cabinet - Data Aire GHFC Series Installation, Operating And Maintenance Manual

Dry cooler ec and psc fans
Table of Contents

Advertisement

The operating life of the equipment can be extended by following a simple preventive
maintenance schedule. This schedule will reduce the possibility of failure of components and
unnecessary malfunction of the system. Although the service technicians must be thoroughly
familiar with the special design features of this equipment before attempting any service or
repair, an experienced technician can perform certain simple maintenance functions to ensure
normal, trouble-free operation.
7.1.2 Maintenance/Inspection Checklist
The maintenance operations detailed in the Maintenance/Inspection Checklist should be
carried out on a regular basis by a suitably qualified Service Technician. It should be noted
that the interval necessary between each 'minor' and 'major' service can vary depending on,
for instance, application, site conditions and expected operating schedule. Normally a 'minor'
service should be carried out every three to six (6) months and a 'major' service once a year.
It is recommended that Data Aire Service Department be contacted for recommendations for
individual sites.

7.2 Cabinet

• Inspect for moisture or any sign of wetness or dripping inside the electrical
enclosure. Determine source of moisture and seal as needed.
• Look for and replace damaged insulating material.
• Check the electrical enclosure door is installed and secured to prevent access and
possible moisture. Repair or replace, as needed.
• Check structural members. Contact our Service Department for any structural
damage.
AIR-COOLED FLUID COOLER
CAUTION: Personal Protective Equipment is to be used for
maintaining and servicing equipment. Some operations when
servicing or maintaining the unit may require additional assistance
regarding manual handling. This requirement is down to the
discretion of the Service Technician. All maintenance and servicing
must compliance with environmental and safety regulatory
requirements.
CAUTION: Remember do not perform a lift that exceeds your
ability.
WARNING:
Turn OFF the disconnect switch to all remote electric
facility power to the unit before servicing or maintenance.
27 • Air-Cooled Condenser Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents