Installation

NOTICE: There is no intent on the part of Data Aire, Inc. to define local
codes or statutes which may supersede common trade practices. The
manufacturer assumes no responsibility for their interpretation. Consult
local building codes and the National Electrical Code (NEC) for special
installation requirements.
1.8.1 Installation Checklist
AIR-COOLED FLUID COOLER
Figure 2 Typical Lifting Method
WARNING:
When preparing the equipment, proper care should be
taken when uncrating the unit. The packaging has wrapping bands
with sharp edges that are under tension, crating has staples and
splinters. Proper Protective Equipment (PPE) should be worn by
qualified personnel.
● Remove the metal strapping bands
● Remove the wooden crating
● Remove the protective plastic covering
WARNING:
Before removing from the packaging inspect the unit for
any damage. Report any damage to the carrier and file a damage
claim.
11 • Air-Cooled Condenser Manual

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GHFC Series and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents