Download Print this page

Advertisement

Quick Links

WATSON DESKING
Page 1 of 2
800.426.1202
Unscrew joint connector nut and washer from
inside of pedestal using M5 Allen wrench.
2" Fender Washer
Joint Connector Nut
M5 Allen wrench.
Lift desk and riser straight up from pedestal.
Make sure not to scratch top of pedestal at
this time. Place desk upide down on floor.
www.watsondesking.com
PRODUCT INSTALLATION:
Storage Support and Overhead Disassembly
Step 2
Step 3
Step 1: For 15" wide drawers
To remove top drawer, press
plastic levers up or down on sides of
drawer slides to disengage drawer.
Tip:
Plastic levers will press in opposite
directions on each side of drawer.
Step 1: For 30" wide drawers
Lift drawer straight upward to
detach tab from drawer slides.
Tip: Lift one corner or side of
drawer at a time.
INS50150
MIRO

Advertisement

loading

Summary of Contents for Watson Desking MIRO

  • Page 1 PRODUCT INSTALLATION: WATSON DESKING Storage Support and Overhead Disassembly Step 1: For 15" wide drawers To remove top drawer, press plastic levers up or down on sides of drawer slides to disengage drawer. Tip: Plastic levers will press in opposite directions on each side of drawer.
  • Page 2 PRODUCT INSTALLATION: WATSON DESKING Storage Support and Overhead Disassembly Step 4 Unscrew all screws connecting riser to desk and remove. Also remove legs and support tube at this time. To Remove Wall Mounted Cabinet: Step 1 Lift the cabinet straight upward to take cabinet off of wall.