Eastsign ROT Series User Manual

Eastsign ROT Series User Manual

Rotary heat press

Advertisement

Quick Links

ROTM20210607
Eastsign
User Manual
Rotary Heat Press ROT-M
User Manual
Eastsign

Advertisement

Table of Contents
loading

Summary of Contents for Eastsign ROT Series

  • Page 1 ROTM20210607 Eastsign User Manual Rotary Heat Press ROT-M User Manual Eastsign...
  • Page 2: Table Of Contents

    Eastsign Content 1. Information ..............................1 2. Safety Instruction ............................2 2.1 Safety parts............................... 2 2.2 Warning Sign ............................2 2.3 Safety Tips ..............................3 3. Specifications .............................. 5 3.1 Specifications of the Machine ........................5 3.2 Nameplate ..............................6 4.
  • Page 3: Information

    Eastsign 1. Information Rotary Heat Press for Ribbon / Lanyard ROT series is suitable for thermal transferring on various ribbon & garment which can be ironed and pressed, without limitation of width. Feeding and collecting rolls and clothing pieces in parallel by roll-to-roll system without drifting the materials to left or right.
  • Page 4: Safety Instruction

    Eastsign 2. Safety Instruction Before the operation, please read the safety instruction carefully to fully understand the machine’s primary structure, function, and operation method. If conditions permit, the training to the operators is required, and the operators, passing the examination, are allowed to operate and maintain. During the operation and maintenance, please pay attention to the warning signs, pasted to the equipment, and improve the safety awareness to prevent the accidents and to guarantee operator’s personnel safety.
  • Page 5: Safety Tips

    Eastsign High Voltage This sign is shown at the inner flank of the box. High Voltage! Don’t touch to avoid electric shock. Chain This sign is shown at the inner flank of the left box. Please don’t let your hand, clothes, hair or other parts of your body touch the chain in operation to avoid injury.
  • Page 6 Eastsign from rolling depression by the vehicles. Mounting card and transducer in the box should be kept clean to avoid metallic conduction material such as dust falling into. Don’t open the protective covering to avoid the electric shock. The working place should be dry and well ventilated. Please stay away from the water or the damp place when use the equipment.
  • Page 7: Specifications

    Eastsign 3. Specifications 3.1 Specifications of the Machine Model ROT-1242M ROT-942M Cylinder Oil-Heated, 50% Full Oil-Heated, 50% Full Voltage 3 Phase 220V/380V/480V 3 Phase 220V/380V/480V Heating Power 18kW 15kW Heating Elements Diameter of Drum 420mm or 16.5" 420mm or 16.5"...
  • Page 8: Nameplate

    Eastsign 3.2 Nameplate...
  • Page 9: Introduction

    Eastsign 4. Introduction 4.1 List of Parts -Front view...
  • Page 10 Eastsign -Rear view Power Indicator: Machine connected to power or not Temperature Control: Oil drum temperature Timer: Control machine daily off time Transfer Speed: working speed of machine/belt speed. Main Power: Main power (On/off) Felt Direction FWD – N – BWD: Control felt direction (Forward – stop – Backward)
  • Page 11: Configuration Of Left Cabinet

    Eastsign 4.2 Configuration of Left Cabinet 4.3 Configuration of Right Cabinet...
  • Page 12: Diagram Of Other Parts

    Eastsign 4.4 Diagram of Other Parts Front View of Oil Drum (46) Thermocouple to Detect (47) Release Bolt to Drain Oil Surface Temperature Cross Section Diagram of Oil Drum (48) Heating Element (49) Heating Oil Thermal Control (50) Press Once and Change Temperature Value by ‘51’ (51) Present Temperature...
  • Page 13: Installation

    Eastsign 5. Installation The machine must be placed on flat floor in the workplace where is bigger than double length and double width of the machine at least. The room was required being dry and ventilated. 5.1 Disassembling of crate 5.1.1.
  • Page 14: Power Connection

    Eastsign 5.3 Power connection Release the screw on main terminal, connect three live wires to terminal L1 L2 and L3 one by one, and connect neutral wire to terminal N. The ground wire should be connected to ground point. Notice: please chose proper power wire base on the rated power data on nameplate.
  • Page 15: Operation Guide

    Eastsign 6.Operation Guide 6.1 Process Diagram 6.1.1 Before switching on the machine, make sure that all electrical wires are connected correctly. The body of the machine must be connected to ground. Switch on the Main breaker. 6.1.2 Turn on the button of“ Power” ‒“ Transform Button” ‒“ Run” on speed controller, When the felt is revolving, press“...
  • Page 16: Notice For Operation And Maintenance

    Eastsign 7. Notice for operation and Maintenance 7.1 Noise The rollers and bearing may expand and create noise when they are heated to certain temperature. Do not worry as it is a normal phenomenon. 7.2 Cleaning Keep clean and tidy so that there is no dirt falling into electric circuit box and transducer. Do not open the protective case to avoid electric shock.
  • Page 17 In generally, the heating oil inside can be used for 3 years, no need to replace it. If necessary, please add oil from the filling hole. Note: Do not replace the parts/heating oil yourself without consulting our engineers. The parts must be provided or approved by Eastsign.
  • Page 18: Electrical Schematic

    Eastsign 8. Electrical Schematic...
  • Page 19: Trouble Shooting

    Eastsign 9. Trouble Shooting Phenomenon Cause Solution Breakdown of solid replay Replace The temperature is out of control The temperature control device is Replace out of control Turn hand wheel and press “Felt Felt is too loose Tension” Gear is skidding...
  • Page 20: General Maintenance

    Eastsign 10. General Maintenance...
  • Page 21: Warranty

    Only in urgent cases, when the operational safety is risked and/or when there is a fear of any disproportionate claims, which shall be immediately notify to Eastsign, the Buyer is entitled to remedy the defect on its own or by third parties, and it shall demand to Eastsign the reimbursement of expenses incurred for this purpose.
  • Page 22: Limitation Of Liability

    Eastsign. The warranty loses all its effects when any equipment or devices or supplies not provided by Eastsign is installed on the Machinery, when the Machinery is modified without prior written approval of Eastsign.
  • Page 23: Contact Us

    Eastsign Contact us Eastsign International Ltd Hong Kong Headquarter Rm 1818,18/F., Shatin Galleria,18-24 Shan Mei Street, Fotan, N.T., Hong Kong Tel: +852 2117 0098 info@eastsign.com Eastsign International Ltd Shenzhen Branch 28I, Tower C, Lvgem Square, 6009 Shennan Avenue, Futian District, Shenzhen, China Tel: +86 755 8296 8521 info@eastsign.com...

This manual is also suitable for:

Rot-mRot-1242mRot-942m

Table of Contents