Summary of Contents for Eastsign SOT-64

  • Page 1 SOT6420210201 Eastsign User Manual Rotary Heat Press SOT-64H User Manual Eastsign...
  • Page 2: Table Of Contents

    Eastsign Content 1. Information .............................. 1 2. Safety Instruction ............................. 2 2.1 Safety parts............................... 2 2.2 Warning Sign ............................2 2.3 Safety Tips ..............................3 3. Specifications ............................5 3.1 Specifications of the Machine ........................5 3.2 Nameplate ..............................6 4.
  • Page 3: Information

    Eastsign 1. Information Rotary Heat Press SOT-64H is developed on the basis of continuous feedback from end users and market requirements. It is entry level equipment for polyester thermal transfer. It is capable of flat transfer for clothes pieces, transfer in roll to roll or piece to piece and thermal transfer for polyester materials. Moreover, the machine occupies small workplace.
  • Page 4: Safety Instruction

    Eastsign 2. Safety Instruction Before the operation, please read the safety instruction carefully to fully understand the machine’s primary structure, function, and operation method. If conditions permit, the training to the operators is required, and the operators, passing the examination, are allowed to operate and maintain. During the operation and maintenance, please pay attention to the warning signs, pasted to the equipment, and improve the safety awareness to prevent the accidents and to guarantee operator’s personnel safety.
  • Page 5: Safety Tips

    Eastsign High Voltage This sign is shown at the inner flank of the box. High Voltage! Don’t touch to avoid electric shock. Chain This sign is shown at the inner flank of the left box. Please don’t let your hand, clothes, hair or other parts of your body touch the chain in operation to avoid injury.
  • Page 6 Eastsign Mounting card and transducer in the box should be kept clean to avoid metallic conduction material such as dust falling into. Don’t open the protective covering to avoid the electric shock. The working place should be dry and well ventilated. Please stay away from the water or the damp place when use the equipment.
  • Page 7: Specifications

    Eastsign 3. Specifications 3.1 Specifications of the Machine Model SOT-64 SOT-64H Cylinder Oil-Heated, 50% Full Voltage 1 or 3 Phase, 220V Heating Power Heating Element Diameter of Drum 260mm or 10" Transfer Speed Up to 0.5m/min or 5.4'/min Max Temperature 240°C or 464°F...
  • Page 8: Nameplate

    Eastsign 3.2 Nameplate...
  • Page 9: Structure

    Eastsign 4. Structure 4.1 Explanation of appearance and all parts...
  • Page 10: Configuration Of Left Cabinet

    Eastsign 4.2 Configuration of left cabinet 4.3 Configuration of right cabinet...
  • Page 11: Installation

    Eastsign 5. Installation Machine should be placed in empty space with flat ground, good ventilation and dry working environment. 5.1 Unpacking (1) Remove the iron nail (2) Loosen the screw on the packing (3) Take away the top cover by hammer and crowbar...
  • Page 12: Notice

    Eastsign Step 3. Installation of chain. After you installation of the woking table was finished, conbine the chain with the sprocket of main motor and 3 riwind shaft, on of them out side the cabinet as below shows. Step 4. Check and fasten all the screws on machine.
  • Page 13: Operation Guide

    Eastsign 6. Operation Guide 6.1. Before switching on the machine, make sure that all electrical wires are connected correctly. The body of the machine must be connected to ground. Press the power switch and belt start rotary switch. Then, adjust the rotary speed on speed adjustor (6) to optimum value. When the heating roller start revolving, press “heating”...
  • Page 14: Notice For Operation

    Eastsign 7. Notice for operation 7.1 Pre-shrink on blanket After the installation finished, it requests to power up machine and accomplish the procedure of pre-shrink on blanket. Please operate in accordance with the instruction as below: Keep new blanket in a low degree of tension.
  • Page 15: Horizontal Adjustment

    Eastsign 7.3 Horizontal adjustment. We recommend a commonly way for levelling machine: 1.Prepare a transparent soft hosepipe with the length of 6 meters and inner diameter of 10mm. 2. Fill up inside with water partially, and hold on both ends of the hosepipe by two persons, then measure the height for the 4 corners of the machine horizontally &...
  • Page 16: Heating System

    In generally, the heating oil inside can be used for 3 years, no need to replace it. If necessary, please add oil from the oil tank. Note: Do not replace the parts/heating oil yourself without consulting our engineers. The parts must be provided or approved by Eastsign.
  • Page 17: Processes Diagram

    Eastsign 8. Processes Diagram...
  • Page 18: Trouble Shooting

    Eastsign 9. Trouble Shooting Phenomenon Cause Solution The solid-state relay is Replace damaged The temperature can not Damage of one or few sets of Replace the electric tube in be higher or rising slowly electric tube in heating unit heating unit...
  • Page 19: Warranty

    Only in urgent cases, when the operational safety is risked and/or when there is a fear of any disproportionate claims, which shall be immediately notify to Eastsign, the Buyer is entitled to remedy the defect on its own or by third parties, and it shall demand to Eastsign the reimbursement of expenses incurred for this purpose.
  • Page 20: Limitation Of Liability

    Eastsign. The warranty loses all its effects when any equipment or devices or supplies not provided by Eastsign is installed on the Machinery, when the Machinery is modified without prior written approval of Eastsign.
  • Page 21: Contact Us

    Eastsign Contact us Eastsign International Ltd Hong Kong Headquarter Rm 1818,18/F., Shatin Galleria,18-24 Shan Mei Street, Fotan, N.T., Hong Kong Tel: +852 2117 0098 info@eastsign.com Eastsign International Ltd Shenzhen Branch 28I, Tower C, Lvgem Square, 6009 Shennan Avenue, Futian District, Shenzhen, China Tel: +86 755 8296 8521 info@eastsign.com...