Download Print this page

Pace XR 3000 Operation Manual page 8

Xr 3000

Advertisement

6.
Set Up
A. XR 3000 as a stand-alone inspection station
Place the XR 3000 on a stable work platform of sufficient capacity to
adequately support the XR 3000. The monitor used to view the images
should be placed on the work surface next to the XR 3000 and not on top of
the XR 3000 as it is not designed to support a monitor and the monitor may
fall.
Locate the foot pedal, composite video cable, and power cord. These should
be connected as shown in Figure 1.
The other end of the composite video cable should be connected to the
composite video input on the video monitor. The power cord should be
connected to a properly grounded 120 VAC power supply.
B. XR 3000 used with the TF 2000 or TF3000 BGA/CSP Rework Center
Place the XR 3000 on a stable work platform of sufficient capacity to
adequately support the XR 3000. The work platform can be the same as the
work platform supporting the TF 2000/TF3000 or may be a separate one as
long as it is close enough to allow for the connection of the composite video
cable to the PC.
Locate the foot pedal, composite video cable, and power cord. These should
be connected as shown in Figure 1.
The other end of the composite video cable should be connected to the
composite video input on the video capture card on the PC. See Figure 2.
Figure 1. The back of the XR 3000
Page 8 of 23

Advertisement

loading