Ariston HS PREMIUM Technical Instructions

Ariston HS PREMIUM Technical Instructions

Condensing wall thermal power plant

Advertisement

Machine Translated by Google
HS PREMIUM
TECHNICAL INSTRUCTIONS FOR INSTALLATION AND MAINTENANCE
CONDENSING WALL THERMAL POWER PLANT
HOT WATER
I
HEATING
I
RENEWABLE
I
AIR CONDITIONING
3300761
3300765
420000255500

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the HS PREMIUM and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Ariston HS PREMIUM

  • Page 1 Machine Translated by Google HS PREMIUM TECHNICAL INSTRUCTIONS FOR INSTALLATION AND MAINTENANCE CONDENSING WALL THERMAL POWER PLANT HOT WATER HEATING RENEWABLE AIR CONDITIONING 3300761 3300765 420000255500...
  • Page 2: Table Of Contents

    Machine Translated by Google General ......................3 Installation Recommendations (Warnings) ........... 3 CE marking ......................3 Safety rules .....................4 Product Description ..................6 Control Panel ....................6 Display .......................... 6 Overview ........
  • Page 3 Machine Translated by Google GENERAL / boiler repair, you must switch off the boiler by INSTALLATION AND FIRST START- turning the external bipolar switch to the “OFF” UP (FIRST START-UP) position. OF THE POWER PLANT MUST BE CARRIED OUT BY QUALIFIED Any repairs carried out using only original spare PERSONNEL IN ACCORDANCE WITH THE parts must be carried out only by qualified technicians.
  • Page 4: General

    Machine Translated by Google GENERAL SAFETY RULES Damage to the device or objects around it Legend symbols: due to the design of splinters, bumps, cuts. Failure to follow the warning instructions presents a risk of injury to persons, even in certain fatal Use suitable electrical appliances (especially circumstances.
  • Page 5 Machine Translated by Google GENERAL acid. blows, cuts. If you smell or see smoke coming out of the Handle the appliance with adequate protection, with the utmost care and caution. appliance, turn off the power, open the Damage to the appliance or objects around windows, and notify the technician.
  • Page 6: Product Description

    Machine Translated by Google PRODUCT DESCRIPTION Control panel The legend: ON / OFF key and select operating mode (summer Winter) +/- keys to regulate the temperature in the sanitary circuit Display +/- keys to adjust the temperature in the heating circuit RESET key Display Figures for indications:...
  • Page 7: Overview

    Machine Translated by Google PRODUCT DESCRIPTION Overview Boiler dimensions 120 120 67 67 65 The legend A. Installation Tour B. Hot water outlet C. Gas inlet D. Cold water inlet E. Installation return Legend Minimum distances for installation In order to 1.
  • Page 8: Template

    Machine Translated by Google PRODUCT DESCRIPTION Installation template 353 (compact)
  • Page 9: Installation

    The pattern nation Category contains high concentrations of chlorine (swimming pool HS PREMIUM 24 EU environment), and / or other toxic products such as ammonia HS PREMIUM 30 EU (hair salon), alkaline agents (laundry) ..., Make sure that the stamp on the package and on the appliance is...
  • Page 10 / alloy components. [mCE] (*) Please contact the regional technical service ARISTON THERMO for any information on recommended products for cleaning / water treatment. Heated floor installations In underfloor heating systems, install a safety thermostat on the underfloor heating circuit.
  • Page 11 Machine Translated by Google INSTALLATION Hydraulic scheme Condensation High energy efficiency produces condensation, which must be eliminated. For this purpose, use a plastic hose placed in such a way as to avoid any stagnation of condensation inside the boiler. This hose must be connected to an exhaust siphon with the possibility of visual inspection.
  • Page 12 Machine Translated by Google INSTALLATION Connection of Suction and Exhaust Pipes The boiler is arranged to be connected to a 60/100 coaxial flue gas suction and exhaust system. burned To use the mounting type with two separate ducts (one suction and one The boiler is suitable for operation in mode B taking air from the exhaust), it is necessary to use one of the two air intakes.
  • Page 13 Maximum length of suction / Combustion air from the environment discharge pipes (m) Diameter B23 Exhaust flue gas. Typology of HS PREMIUM Pipes (mm) evacuation Ambient air suction 24 EU 30 EU B33 Exhaust gas in a single or collective ø...
  • Page 14: Connecting The Room Thermostat

    Machine Translated by Google INSTALLATION Connecting accessories and peripheral equipment CAREFUL To access the connection of accessories and a BEFORE ANY INTERVENTION AT THE peripheral equipment: POWER PLANT, SWITCH OFF THE POWER - Disconnect the boiler from the power supply SUPPLY WITH THE HELP OF THE EXTERNAL BIPOLAR - Unlock and remove the control panel cover SWITCH.
  • Page 15: Diagram

    Machine Translated by Google INSTALLATION Boiler wiring diagram For a better safety, qualified personnel are inspected by the electrical installation. The manufacturer is not responsible for any damage caused by the failure of the system to be grounded or for power outages. Room thermostat 1 and heated floor thermostat Room thermostat 1...
  • Page 16: Procedure

    Machine Translated by Google PUTTING INTO SERVICE First start Preparation for commissioning In order to guarantee the safety and proper operation of the plant, 1. Make sure that: commissioning must be carried out by a qualified technician who is - the gas valve is closed; authorized by law to do so.
  • Page 17 Machine Translated by Google PUTTING INTO SERVICE Burn control procedure Operation 3 The order of operations must be followed in this procedure. Adjust the CO2 level to the maximum gas flow (domestic hot water) Perform a domestic hot water extraction at the maximum water flow. Operation 1: Fill the gas valve.
  • Page 18 Machine Translated by Google PUTTING INTO SERVICE Note: The "test mode" function is deactivated automatically Maximum heating power setting - parameter 231 after 10 minutes or manually by briefly pressing the RESET key. It is possible to adjust the maximum heating power between the maximum permissible appliance and the minimum.
  • Page 19 Machine Translated by Google PUTTING INTO SERVICE Gas regulation table HS PREMIUM 24 EU 30 EU Parameter Lower Wobbe Index (15 ° C, 1013 mbar) (MJ / m3) 45,67 45,67 Slow ignition Maximum heating power Minimum fan speed (%) Maximum fan heating speed (%)
  • Page 20: Central Protection Systems

    Machine Translated by Google CENTRAL PROTECTION SYSTEMS Conditions for switching off the appliance Important The boiler is protected from malfunction by the electronic board that If the shutdown is repeated frequently, we recommend that you contact an performs certain internal controls, which triggers, if necessary, a authorized Technical Assistance Center.
  • Page 21 Machine Translated by Google CENTRAL PROTECTION SYSTEMS Anti-freeze function Summary table with error codes If the central flow NTC probe measures a temperature below 8 ° C, the circulation Primary circuit pump remains in operation for 2 minutes. 1 01 Excessive temperature After the first two minutes of driving, the 1 03 following situations may occur:...
  • Page 22: Technical Area

    Machine Translated by Google TECHNICAL AREA Access to setting-adjustment parameters - diagnostics The boiler allows you to fully manage the heating system and domestic hot water. Navigating within the parameters allows you to customize the operation of value description the installation and its related peripherals, thus optimizing comfort and energy consumption.
  • Page 23 Machine Translated by Google TECHNICAL AREA value value description description from 5 to 200 423 Parallel offset curve temp. from - 7 to 7 252 Domestic hot water flow delay (high temperature) (0.5 to 20 seconds) da - 14 a + 14 Aries (low temperature) 0 = anti-...
  • Page 24: Maintenance

    Machine Translated by Google MAINTENANCE Instructions for opening the housing and checking the inside of the boiler Before carrying out any operation on the boiler, disconnect it from the power supply by closing the external bipolar switch and the gas valve. In order to have access inside the boiler it is necessary to: 1.
  • Page 25: Notes

    If you use such a liquid, please contact the 6. Checking the operation of the heating safety systems: - temperature limit safety. ARISTON Service Center for any further information on the most 7. Checking the operation of the safety systems on the side of suitable products to use.
  • Page 26: Information

    Machine Translated by Google MAINTENANCE Stamp plate features User information Inform the user about how the system works. In particular, provide the user with all instruction manuals and warn the user to keep them with the device. Warn the user to: - Periodically check the water pressure in the installation;...
  • Page 27: Technical Data

    Machine Translated by Google TECHNICAL DATA HS PREMIUM Model 24 EU 30 EU 0085CO0349 CE certificate (pin) B23, B23p, B33 C13(x),C23, C33(x), C43(x), C53(x), Thermal power plant type C63(x) C83(x), C93(x) Nominal calorific value max / min (Pci) ..........Qn...
  • Page 28 NOx nitrogen oxide emissions PRODUCT SHEET - EU 811/2013 Brand ARISTON Model: HS PREMIUM EU 24 EU 30 EU Declared pregnancy profile Seasonal energy efficiency class for space heating Energy efficiency classes related to water heating Nominal thermal power Pn...
  • Page 29 Machine Translated by Google TECHNICAL DATA Instructions for completing the label for the package packages of the space heating (or dual function heating), temperature controller and solar device. 1. the name or trade mark of the trader and / or supplier; 2.
  • Page 30: Product Sheet

    Machine Translated by Google TECHNICAL DATA DOUBLE FUNCTION HEATING INSTALLATION PACKAGES, in addition, for preferential dual-function heat pump heating systems: TEMPERATURE REGULATOR AND SOLAR DEVICE The package leaflet for dual-function heating, temperature controller and -V: the value of the difference between the seasonal energy yields solar device packages shall contain the elements referred to in points (a) related to the heating of the premises in average and colder and (b):...
  • Page 31 Machine Translated by Google TECHNICAL DATA Figure 5 Energy efficiency of water heating of the dual function heating system Declared pregnancy pro: ‘I’ Solar contribution - From the saddle of the solar device Auxiliary electricity ‘III’ - ‘I’ = (1,1 x 'I' - 10%) x 'II' - Energy efficiency of water heating of the package in average climatic conditions Energy efficiency classes related to water heating of the package in average climatic conditions BA A +...
  • Page 32 Machine Translated by Google ITALIAN DESIGN Ariston Thermo Romania srl Polona Business Center, 68-72 Polona Street, 1st Floor 010505, 1st District, Bucharest Phone: 004021-2319521 Fax : 004021-2319510 e- 199 111 222 mail: service.ro@aristonthermo.com www.ariston.com/ro...

This manual is also suitable for:

33007613300765

Table of Contents

Save PDF