Page 1
MODEL FRP DUST COLLECTOR Installation and Operation Manual This manual contains specifi c cautionary statements relative to worker safety. Read this manual thoroughly and follow as directed. It is impossible to list all the hazards of dust control equipment. All persons involved with the equipment or systems should be instructed how to operate in a safe manner.
MICRO AIR ® CLEAN AIR SYSTEMS WARNING The installation/operation manual must be read and followed in its entirety. Process owners/operators have important responsibilities relating to combustible hazards. Process owners/operators must determine whether their process creates combustible dust, fume, or mist. If combustible dust, fumes, or mist is generated, process owners/operators should at a minimum: •...
MICRO AIR ® CLEAN AIR SYSTEMS MODEL FRP SPECIFICATIONS CABINET DIMENSIONS: FRP4 72” H x 53” W x 48” D FRP6 92” H x 53” W x 48” D FRP6-2 94” H x 95” W x 48” D FRP6-3 94” H x 136” W x 48” D FRP8 112”...
MICRO AIR ® CLEAN AIR SYSTEMS INSTALLATION: INSPECTION: The Micro Air dust collector is shipped on one or more skids. All skids should be inspected for any visible damage that may have occurred during shipment. Report any damage to the delivery carrier. CODES: Codes may regulate recirculating fi...
Page 6
MICRO AIR ® CLEAN AIR SYSTEMS 4. When supplied, bolt on angle braces with provided a. Apply self-adheasive foam on the bolt hole fl ange hardware (Figure 5). Ensure each leg is plumb before of the inlet plenum. tightening the bolts. b.
MICRO AIR ® CLEAN AIR SYSTEMS ACCESSORY INSTALLATION: BARREL LID 1. Bolt adapter plate and hopper adapter to the hopper DUST COLLECTION HOPPER using the four sets of 3/8” hardware (Figure 9). 1. Apply self-adheasive foam to the bolt hole fl ange on 2.
MICRO AIR ® CLEAN AIR SYSTEMS TOP MOUNTED BLOWER 4. Apply the self-adheasive foam to the vertical braces as 1. Apply self-adheasive foam to the bottom side of the shown in Figure 11. blower fl ange (Figure 10). 5. Re-install the motor shroud around the motor and 2.
MICRO AIR ® CLEAN AIR SYSTEMS PHOTOHELIC GAUGE 1. Mount the photohelic gauge into the photohelic mounting bracket following the mounting instructions contained in the photohelic packaging. 2. Mount the two male barb fi ttings in the pressure ports Exhaust Grille located on the side of the photohelic gauge.
MICRO AIR ® CLEAN AIR SYSTEMS COMPRESSED AIR INSTALLATION: Set Screw Power Connection The compressed air inlet for the Roto-Pulse cleaning Pressure Switch system is at the top of the surge tank located on the side of the unit (Figure 15). A minimum of a 3/4 inch diameter line and clean, dry compressed air at a pressure of 80 psi to 90 psi is required for proper operation of the Roto-pulse cleaning system.
MICRO AIR ® CLEAN AIR SYSTEMS 4. Wire from the Overload T1, T2, and T3 to the motor 1. For proper cleaning, the compressed air pressure should electrical housing. Wire size should be the same as be regulated at 80 psi to 90 psi. step 3.
MICRO AIR ® CLEAN AIR SYSTEMS Note: While this time can be adjusted it is recommended that you leave the “ON TIME” at the factory setting. If less cleaning is needed you should increase the time between pulses as a means of reducing the amount of cleaning.
MICRO AIR ® CLEAN AIR SYSTEMS FRP CABINET PARTS LIST FIGURE 19 ITEM PART DESCRIPTION ITEM PART DESCRIPTION 36720-13 Filter Support Assembly (Roto-Pulse) P2921 DPDT Relay Washer (Supplied with fi lter) P1754 Transformer P3649 4-Prong Knob P3910 Contactor P7400RM 80/20 Cartridge Filter...
MICRO AIR ® CLEAN AIR SYSTEMS FRP ROTO PARTS LIST FIGURE 22 FRP DOOR PARTS LIST FIGURE 23...
Page 32
MICRO AIR ® CLEAN AIR SYSTEMS THIS PAGE INTENTIONALLY LEFT BLANK...
Page 33
MICRO AIR ® CLEAN AIR SYSTEMS INSTALLATION NOTES: Date of Installation: Installer: Voltage: L1-L2 L2-L3 L3-L1 Amp Draw: Air Pressure: L2815 9/18...
Need help?
Do you have a question about the FRP and is the answer not in the manual?
Questions and answers