Emerson Anderson Greenwood 93 Series Installation And Maintenance Instructions Manual

Pilot operated safety relief valves
Hide thumbs Also See for Anderson Greenwood 93 Series:

Advertisement

Quick Links

ANDERSON GREENWOOD SERIES 93T PILOT OPERATED SAFETY RELIEF VALVES
INSTALLATION AND MAINTENANCE INSTRUCTIONS
Before installation these instructions must be fully read and understood
Installation and maintenance instructions
for Series 93T POSRV (Pilot Operated Safety
Relief Valves).
The intent of these instructions is to acquaint
the user with the storage, installation and
operation of this product. Please read these
instructions carefully before installation.
WARNING
Removal of the seal wires in an attempt to adjust
and/or repair this product by unauthorized or
unqualified persons voids the product warranty
and may cause damage to equipment and serious
injury or death to persons.
The product is a safety related component
intended for use in critical applications. The
improper application, installation or maintenance
of the product or the use of parts or components
not manufactured by Anderson Greenwood may
result in a failure of the product.
Any installation, maintenance, adjustment, test,
etc. performed on the product must be done
in accordance with the requirements of all
applicable Anderson Greenwood procedures and
instructions as well as applicable National and
International Codes and Standards.
SAFETY PRECAUTIONS
When the pressure relief valve is under
pressure never place any part of your body
near the pilot exhaust nor the outlet of the
main valve.
The main valve outlet should be piped or vented
to a safe location.
Always wear proper safety gear to protect
head, eyes, ears, etc. anytime you are near
pressurized valves. Never attempt to remove
the pressure relief valve from a system that is
pressurized.
Never make adjustments to or perform
maintenance on the pressure relief valve while
in service unless the valve is isolated from
the system pressure. If not properly isolated
from the system pressure, the pressure relief
valve may inadvertently open resulting in
serious injury.
Remove the pressure relief valve prior to
performing any pressure testing of the system.
Emerson.com/FinalControl
The safety of lives and property often depends
on the proper operation of the pressure relief
valve. The valve must be maintained according
to appropriate instructions and must be
periodically tested and reconditioned to ensure
correct function.
STORAGE AND HANDLING
Pressure relief valve performance may be
adversely affected if the valve is stored for an
extended period without proper protection.
Rough handling and dirt may damage, deform,
or cause misalignment of valve parts and may
alter the pressure setting and adversely affect
valve performance and seat tightness. It is
recommended that the valve be stored in the
original shipping container in a warehouse
or as a minimum on a dry surface with a
protective covering until installation. Inlet and
outlet protectors should remain in place until
the valve is ready to be installed in the system.
1 GENERAL VALVE DESCRIPTION AND
START UP
1.1 Operation
The Anderson Greenwood Pilot Operated Safety
Relief Valves utilize the principle of back-
loading the top, or large area, of a differential
area diaphragm with line pressure to hold
the diaphragm closed up to set pressure.
At set pressure the pilot valve relieves,
partially evacuating the dome (volume above
the diaphragm) and the seat assembly lifts
permitting discharge from the main valve.
When the pilot reseats, line pressure is diverted
to the dome closing the main valve.
1.2 Installation
Both inlet and outlet may be standard ANSI of
DIN flange connections and are to be installed
in accordance with accepted piping practices.
The installed position of the safety valve should
be in the upright position as shown in Figure 1.
When remote pressure pick-up is used the pilot
supply tube is connected to a remote location
rather than to the inlet neck of the valve. If a
block valve is used in the remote pilot supply
line, be sure it is opened before pressurizing
the system or opening the isolating block valve
under the main valve, if one is used.
© 2017 Emerson. All rights reserved.
Note: remote pressure pick-up piping must
have the equivalent flow area of ½" tubing for
lengths up to 20 feet. For lengths greater than
20 feet, larger tubing or pipe should be used.
Engineering Doc. #05.9040.082 Rev. E
VCIOM-03093-US 15/01

Advertisement

Table of Contents
loading

Summary of Contents for Emerson Anderson Greenwood 93 Series

  • Page 1 Engineering Doc. #05.9040.082 Rev. E VCIOM-03093-US 15/01 © 2017 Emerson. All rights reserved. Emerson.com/FinalControl...
  • Page 2 ANDERSON GREENWOOD SERIES 93T PILOT OPERATED SAFETY RELIEF VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS External Pilot valve blowdown adjustment Outlet Supply tube Nameplate Main valve Inlet (typical) FIGURE 1 1.3 Start-up Larger size valves may require that the retainer There must be pressure at the valve inlet be pulled into place with the retainer screws.
  • Page 3: Parts List

    ANDERSON GREENWOOD SERIES 93T PILOT OPERATED SAFETY RELIEF VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS PARTS LIST Item Description Diaphragm retainer Seat retainer Nozzle Primary seat Spring pin Guide spring Dipper tube Guide Body Secondary seat Seat plate Diaphragm Top plate pilot Valve seal Body gasket Nozzle...
  • Page 4: Pilot Adjustment

    ANDERSON GREENWOOD SERIES 93T PILOT OPERATED SAFETY RELIEF VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS PARTS LIST Item Description Pressure adj. bolt Bonnet Spring Sense plate Upper case Spacer ring Lower case Boost spacer Spindle diaphragm Nozzle Seat Body Vent Check plate Pilot diaphragm Boost plate Sense spacer...
  • Page 5 ANDERSON GREENWOOD SERIES 93T PILOT OPERATED SAFETY RELIEF VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS 4.5 Adjustment tolerances Set pressure Minimum crack pressure as % Supply pressure as % of set for Pilot action Set pressure tolerance of nameplate set dome pressure recovery Snap 2”WC to 1.0 psi ±3% 90 ±...
  • Page 6: Accessory Repair

    ANDERSON GREENWOOD SERIES 93T PILOT OPERATED SAFETY RELIEF VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS 5 ACCESSORY REPAIR 5.1 Check valve The check valves used on the dual pilot, backflow preventer, and field test consist of an upper body, a lower body, and a diaphragm. Refer to Figure 5.
  • Page 7: Soft Goods Repair Kits

    ANDERSON GREENWOOD SERIES 93T PILOT OPERATED SAFETY RELIEF VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS Field test valve "B" Flexible hose Test gage Block valve "A" Vent valve "C" Nitrogen bottle FIGURE 7 8 SOFT GOODS REPAIR KITS Soft goods repair kits contain all the seals and seats to repair a valve.
  • Page 8 © 2017 Emerson. All rights reserved.

This manual is also suitable for:

Anderson greenwood 93tAnderson greenwood 93t series

Table of Contents