Safety Stages of the installation may require the use of personal protection equipment. When working at heights refer to HSE guidance. General Dimensions Fig 1 - 2M Bursley Canopy Fig 1 Fig 2 - 3M Bursley Canopy Fig 2...
Page 3
Wall Fixing Detail It is the responsibility of the installer to ensure that the wall is suitable for the Bursley canopy. The Bursley canopy is drilled with Ø11.5 holes to bolt to wall. The installer should ensure that the wall fixings are suitable to secure the Banbury cano- ...
Fig 5 Bolt the mid brace(s) to the radius rails using M10 x 70mm socket dome head screws. Fig 6 Fit the 60 x 40mm plastic caps to the front ends of the shelter. Fig 7...
Page 5
Frame Assembly Fit the 40 x 40mm plastic caps to the bottom ends of the shelter. Fig 8 3 metre Bursley shelter frame shown fully assembled. Fig 9 2 metre Bursley shelter frame shown fully assembled. Fig 10...
Page 6
Plastic Installation Before fitting the sheet, IAE advise that the mid braces are pre drilled using a drill screw. Drill until it starts to thread then remove and clean to remove all swarf. Pre drill ø10mm holes in sheet first.
Maintenance Routine visual inspection Smoking shelter equipment may be subject to heavy use or vandalism, weekly inspection of this type can be necessary. Examples of frame inspection points are: Cleanliness. Tightness of all fixings. Signs of corrosion or wear. Missing parts.
Page 8
Exploded Detail & Bill Of Materials for 2M Canopy Fig 13...
Page 9
Exploded Detail & Bill Of Materials for 3M Canopy Fig 14 IMPORTANT Only use genuine IAE service parts when servicing IAE equipment...