IM AquaPipe Table of Contents 1 Incoming material inspection 9 Connections to concrete shafts and wall lead-throughs 2 Transport to the construction site 10 Flexible connections of pipes 3 Unloading the lorry to shafts 4 Storage at the construction site 11 Installation of fittings 5 Transport to the pipe trench 12 Installation of the retrofit...
IM AquaPipe Incoming material inspection Check pipes, pipe components, shafts, the manufacturer’s specifications. Care- this down on the delivery note. shaft components and accessories upon fully examine all parts both upon deliv- delivery to make sure they are labelled ery and right before installation to make sufficiently and comply with the require- sure that they are free from damage.
IM AquaPipe Transport to the pipe trench Thanks to their low weight, the transport pose any risk of damaging pipe compo- porting individual pipes using chains or ropes is forbidden. of individual pipes and accessories up to nents and/or shafts. Implicitly avoid a nominal diameter of DN 350 and/or of hooks, chains, cables or other tools shafts to the pipe trench does not...
IM AquaPipe Installation 7.2 Installation of pipes and shafts 7.2.1 Material inspection Before installation, check pipes, pipe might have occurred during transport components, shafts, shaft components and/or storage. Damaged components and accessories for damage which must not be installed. 7.2.2 Pipe installation Connect pipes using push-fit couplings.
IM AquaPipe Installation 7.2.3 Shortening pipes Cut the pipes to length in the middle of the corrugation trough and align upright to the pipe axis using a fine-toothed saw or other appropriate tools. Remove edges and irregularities on the cutting surfaces with a grater, file or another suitable tool.
IM AquaPipe Installation 7.2.6 Placing the extension pipe (continued) extension pipe until it reaches the inside aligned upright when backfilling. The stops of the insertion area only, not shafts can be seen better during the beyond that. The remaining area below construction period if the extension the stops serves as a compensating pipes protrude from the planum.
IM AquaPipe Connections to concrete shafts and wall lead-throughs Only FRÄNKISCHE shaft lining must individual spots into the first com- be used for the connections of pipes to plete corrugation trough. (When cut- shafts or wall lead-throughs. ting pipes, make sure that cuts are in the middle of the corrugation trough 1.
Page 9
IM AquaPipe 12 Installation of the retrofit AquaDock® connection 1. Cutting a hole re 1. Use an appropriate hole saw (Ø 178.5 ± If the on-site conditions allow for it, 0.5 mm) incl. pilot drill to cut a hole into the hole should be cut outside the the main pipe.
IM AquaPipe 13 Lateral connections to concrete pipes and concrete shafts The concrete connection set allows the 2. Insert the connection sealing into 5. Centrally align the concrete cuff retrofit connection to concrete pipes and the drill hole without lubricant. and insert into the sealing.
Page 11
IM AquaPipe Contact International Sales Director International Sales Technology Horst Dörr +49 9525 88-2490 Dinah Nigrowics +49 9525 88-8155 Stefan Weiß +49 9525 88-8824 horst.doerr@fraenkische.de dinah.nigrowics@fraenkische.de stefan.weiss@fraenkische.de Andreas Lang +49 9525 88-8216 andreas.lang@fraenkische.de European Sales Director European Sales Jennifer Gernert +49 9525 88-2569 Klaus Lichtscheidel +49 9525 88-8066 jennifer.gernert@fraenkische.de...