Page 1
P R O F E S S I O N A L S T A T I C C O N T R O L P R O D U C T S Autoanalysis System PGA-710 Getting Started Operations Guide...
Page 2
Copyright 2001-2015 by PROSTAT Corporation. All rights reserved. Printed in the United States of America. No part of this manual may be used or reproduced in any manner whatsoever without written permission. For information contact PROSTAT Corporation, 1072 Tower Lane, Bensenville, IL 60106...
Installing the Autoanalysis Application Software ............4 Connecting the PGA-710 Autoanalysis System to your computer ........5 Adjust or Confirm the “zero” reference for the PGA-710 System ........6 Assembling your Autoanalysis System to the Field Meter and Charge Plate Monitor ..7 Capture and Analyze Data ....................
Microsoft DirectX 9b Instrument input limits to +/- 2 volts. Note: Providing greater than +/- 2 volts to the PGA-710 Autoanalyzer will void the warranty. For appropriate adapters or cables, please contact Prostat Corporation or your Prostat Authorized Reseller.
2. Choose Start > Run. Click Browse and the installation, do the following: choose the Setup.exe file. 3. Follow the on-screen instructions. Choose Help > About Prostat Autoanalysis System… and click on the 4. If prompted to install the .NET Register button to be taken to the Framework 1.1 Package, click Yes.
COM Port or via IR Technology. NOTE The below procedure is based on the use of the provided USB cable. For information on how to connect the PGA-710 via its RS-232 or InfraRed, refer to the Operations Manual. Step 3 Step 4...
PGA-710 Autoanalysis System At this point, the “Save and Erase” LED will be ON indicating the PGA-710 Autoanalyzer’s battery is receiving a charging voltage from the computer’s USB. NOTE This charge is not sufficient to completely charge the battery during normal operations. See Procedure for using the Autoanalysis System via USB the Operations Manual for more details.
Step 7 Step 8 Confirming the “zero” Reference Connecting the Field Meter 1. Assemble your professional Prostat 1. Click the Voltage Auto Balance (F11). This shows whether or not the unit is PFM-711A Field Meter and the CPM- zeroed. If the unit is not +/- 2 volts, 720A Charge Plate Monitor.
USB, or stores it for future use. Anything your field meter measures will be transmitted via the analog cable to the PGA-710, then to the computer where the dynamic measurements are displayed on the screen.
Page 10
PGA-710 Autoanalysis System Step 11 Step 12 Adding a Minimum and a Maximum Voltage Generation 1. Trimmed portions of the chart are 1. Click the Adjust button. This allows to eliminated from the analysis add or remove minimum or maximum peaks from the analysis.
PGA-710 Autoanalysis System There should be an equal number of alternating minimum and maximum peaks. Step 13 Step 14 Generating a Report Entering Information on Report 1. To generate a report, you can either click 1. You can provide detailed information...
Page 12
Copyright 2001-2015, Prostat Corporation Printed in U.S.A. 1072 Tower Lane, Bensenville, IL 60106 USA www.prostatcorp.com...
Need help?
Do you have a question about the PGA-710 and is the answer not in the manual?
Questions and answers