Crown CEM-1524 Instruction Manual page 19

Table of Contents

Advertisement

Available languages

Available languages

2. Set steel mesh into metal funnel, make sure the tube on the funnel aligns with groove in the appliance,
then insert the funnel into the appliance from the "Insert" position, and you can fix them into coffee
maker firmly through turn it anticlockwise until it is at the lock position.(See fig. 1).
3. Remove the cup from the cup warming plate. Then place the hot cup (your cup) on removable cup shelf.
4.
At the time, the ready indicator (green) is illuminated, once the green lamp is illuminated, you should
press down the pump control button to the lower position which is the "
moment, there will be coffee flowing out.
5.You should press and release the
obtained or the colour of coffee changes weak obviously, the power indicator and ready indicator go out
and the coffee maker stops working, your coffee is ready now.
WARNING: Do not leave the coffee maker unattended during making the coffee, as you need operate manually sometimes!
6. After finishing making the coffee, you can take the metal funnel out through turn clockwise, then pour the
coffee residue out with the steel mesh pressed by press bar.
7. Let them cool down completely, then rinse under running water.
FROTHING MILK/ MAKE CAPPUCCINO
You get a cup of cappuccino when you top up a cup of espresso with frothing milk.
Method:
1. Prepare espresso first with container big enough according to the part "MAKE ESPRESSO COFFEE",
make sure that the steam control knob is at the minimum position.
2. Press down the coffee/steam button to the lower position which is the
ready indicator (green) is illuminated.
Fig.1
to turn off the unit manually when desired coffee is
ON/OFF button
" position, waiting for a
position, waiting for until the

Advertisement

Table of Contents
loading

Table of Contents