6. The Energy Meter is successfully paired with the Gateway when LED1 Indicator turns
solid and LED2 Indicator blinks.
7. Refresh the "Energy Monitoring" page by pull it down and release. The Energy Meter
should now appear in the app as unique serial number.
8. Click on the Energy Meter serial number to verify the setup and make sure the Energy
Meter is correctly installed. The Active Power value should be in positive (Refer to below
image).
Note: If any of the value is negative, switch the polarity of the respective clamp. Make sure the
arrow is always directing towards the load. (Do not proceed if you do not know what you are
doing and get help from a qualified electrician instead).
7
Active Power
Single Phase – Only phase A
Three Phase – Phase A,B,C