Set Up And Preparation For Operation - Benchmark 65575-9 Manual

9 ton electric log splitter
Table of Contents

Advertisement

SET UP AND PREPARATION FOR OPERATION

1. Lift the log splitter by the handles at both ends and place it on a 60-75cm high,
stable, flat and level work surface.
2. Familiarize yourself with the controls and features of this log splitter in the
illustrations.
1. Log Pusher
2. Work Table
3. Wedge
4. Lift Handle
5. Support Leg
6. Log Retaining Plates
7. Switch
8. Motor
9. Pushbutton Box
10. Wheels for Minor
Moving ONLY.
11. Hydraulic Control Lever
12. Control Lever Guard
13. Bleed Screw
14. Oil Drain Bolt
w/ Dipstick
7
10
13
Before operating the log splitter, the Bleed Screw
should be loosened by some rotations until air can go
in and out of the oil tank smoothly.
Air flow thru the Bleed Screw hole should be
detectable when the log splitter is in operation.
14
Before moving the log splitter, make sure the Bleed
Screw is tightened to avoid oil leaking from this point.
Failure to loosen the bleed screw will keep the sealed air in
hydraulic system being compressed after being decompressed.
Such continuous air compression and decompression will blow
out the seals of the hydraulic system and cause permanent
damage to the log splitter.
12
11
9
8
2
1
6
7
3
4
5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

5240-547

Table of Contents