MTHTrains RailKing Steel Arch Bridge Manual

MTHTrains RailKing Steel Arch Bridge Manual

Advertisement

Steel Arch Bridge
The Steel Arch Bridge adds more excitement and realism to
your layout. Constructed from sturdy ABS plastic, the Steel
Arch Bridge is a great addition to any O-27 or O Gauge layout.
The bridge comes semi-assembled with most parts necessary to
integrate it with existing layout components. Operation and set
up is made easy by following the instructions on the inside.
PLEASE READ BEFORE USE AND SAVE
www.mthtrains.om

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the RailKing Steel Arch Bridge and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for MTHTrains RailKing Steel Arch Bridge

  • Page 1 Arch Bridge is a great addition to any O-27 or O Gauge layout. The bridge comes semi-assembled with most parts necessary to integrate it with existing layout components. Operation and set up is made easy by following the instructions on the inside. PLEASE READ BEFORE USE AND SAVE www.mthtrains.om...
  • Page 2 Instructions The Steel Arch Bridge is comprised of four (4) major components, the bridge ® itself, and three piers. Also included are 12 pier mounting screws and 3 Lionel restle Pier Adapters. The bridge also features a beacon which flashes when connected to a 14-20 volt power supply.
  • Page 3 Track Installation M.T.H. RealTrax® Connect three sections of M.T.H. RealTrax® together and slide the assembly onto the framing base of the bridge as shown in figure 4a. Other Track Systems For track systems other than M.T.H. RealTrax®, place the track on top of the bridge framing base and mount the track using the track mounting screw holes provided in the frame as shown in figure 4b below.
  • Page 4 ® ™ Lionel FasTrack ® ™ To use Lionel FasTrack you will need to remove the track guides (Figure 3a). To remove the track guides first remove the 12 screws from the bottom of the bridge (Figure 3b). Once the guides are removed slide the track into the framing base of the bridge (Figure 3c).
  • Page 5 All M.T.H. products purchased from an Authorized M.T.H. Retailer are covered by this warranty. See our Website www.mthtrains.com to identify an M.T.H. Retailer near you. M.T.H. products are warrantied for one year from the date of purchase against defects in material or workmanship, excluding wear items such as light bulbs, pick-up rollers, batteries, smoke unit wicks, and traction tires.

Table of Contents