Shut Down - Cold Jet Aero 40FP Operator's Manual

Hide thumbs Also See for Aero 40FP:
Table of Contents

Advertisement

UNIT OPERATION
RE-LOADING DRY ICE
Always wear gloves to protect hands from exposure to cryogenic temperatures.
Disable the applicator.
1.
Place dry ice into the hopper.
2.
3.
Enable the applicator mode to the air + dry ice position.
4.
Squeeze the blast applicator trigger to blast.
5.

SHUT DOWN

Always wear gloves to protect hands from exposure to cryogenic temperatures.
Always disconnect electric cables and hoses before transporting the unit.
To shut down the Aero 40FP:
1. Stop blasting and push in the Disable Blast Button on the Control Panel.
2. Remove unused ice from the hopper.
3. Pull out the Disable Blast Button on the Control Panel.
4. Flip the Air/Ice Control Switch on the Applicator to Air Only and blast for 1 minute.
5. Stop blasting and disable the Applicator Safety.
6. Turn OFF the Power Switch.
7. Turn OFF the compressed air supply.
8. Open the bleed valve to relieve all remaining pressure.
9.
10. When the air hose is fully depressurized, disconnect the machine.
When shutting the machine down for more than 15 minutes, always make sure the hopper is
empty and blast with air only for 1 minute. Failure to do so may result in feeder and/or nozzle
.
freeze-up
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents