Installation
5. Ensure that the compressor rail assembly is free to move on the rubber
isolators.
Figure 6 — Removing C25 through C60 Scroll Compressor Shipping
Hardware Installation
General Unit Requirements
The checklist listed below is a summary of the steps required to successfully
install a commercial air cooled unit. This checklist is intended to acquaint the
installing personnel with what is required in the installation process. It does
not replace the detailed instruction called out in the applicable sections of
this manual.
[ ] Verify that the power supply complies with the unit nameplate
specifications.
[ ] Check the unit for shipping damage and material shortage; file a freight
claim and notify Trane office.
[ ] Verify that the installation location of the unit will provide the required
clearance for proper operation.
Chilled Water Piping Requirements
[ ] Flushing the chilled solution piping system, if applicable.
CAUTION
Evaporator Damage!
If using an acidic, commercial flushing solution, flush all chilled solution
piping before making the final connection to the EVP chiller barrel.
Failure to do so may result in evaporator damage.
[ ] Install heat tape and insulation, if necessary, to protect any exposed
solution piping from external freezing conditions.