4. Ins t al lati on
Installation
Once the insulation jacket has been installed, fi t the
cover to the top of the Hygienik. The cover consists
of two parts. First, fi t the smaller part with the fl eece
insulation facing inward. Then fi t the larger part with
the plastic side facing outward. Refer to the photos on
the left side of this page.
The plastic cover must not be mounted over the
insulating jacket. The wave at the upper end of
the insulating jacket is a design feature and must
not be covered by the plastic cover.
The scope of delivery includes plugs, fl eece material
and polystyrene caps to cover and insulate the con-
nections that are not used. Fit these as required. We
recommend that you insulate and cover connections
that are not used, as this can reduce heat losses.
Plug
Insulating material made of fl eece
Hygienik 500 l - 1000 l
Hygienik 1500 l - 2000 l
Polystyrene covers
24
(C) IDM ENERGIESYSTEME GMBH
Installation instructions Hygienik 2.0