Page 1
I n s t a l l a t i o n i n s t r u c t i o n THE ENERGYFAMILY H Y G I E N I K 2 . 0 W I T H H O T WAT E R S TAT I O N 2 . 0 QUALITY SINCE HEAT PUMPS FROM AUSTRIA www.idm-energie.at...
3. T ECHNICAL DATA YGIENIK 4. I NSTALLATION 4.1. Installation conditions for the Hygienik 2.0 4.2. Installation location of the Hygienik 2.0 4.3. Connecting sockets of the Hygienik 2.0 4.4. Installing the insulation jacket with a hook strip 5. I NSTALLING THE HOT WATER STATION 5.1.
Page 3
6.2.3. TERRA SW Complete HGL + Hygienik 2.0 with LSP + circulation S4.2-0-1-0-1 6.2.4. TERRA SWM HGL + Hygienik 2.0 + Termo + 1 HC + Passive cooling S2.2-0-2+5-1-0 6.2.5. AERO ALM + Hygienik 2.0 with separatin plate + circulation L7.1-0-1-0-1 6.2.6.
1 .2. Sa fe ty in s tru ct i o ns Installation and maintenance work can be associated Only original iDM spare parts or spare parts comply- with dangers resulting from high system pressures, ing with iDM specifi cations may be used! high temperatures and live parts and may only be carried out by specialist staff...
Disposal contrary to the regulations may lead to damage to the environment and In the case of hot water modules from iDM Energie- health and may be subject to penalty systeme, the following limit values prescribed by the under law.
The hot water station can either be mounted directly hygienic hot water supply using a counterfl ow plate on the Hygienik 2.0 or on a wall. This means it is also heat exchanger. possible to operate the hot water station with a tank The tank containing heating water is heated as re- made by another manufacturer.
This is the total quantity of hot water at 45 °C that for diff erent tank and heat exchanger sizes. The fol- can be tapped from a Hygienik 2.0 when the tank is lowing criteria must be considered in order to select heated to 60°C right to the bottom and is not reheated...
(Version with smooth tube heat exchanger) Max. Collector surface (Version with smooth tube heat exchanger) Max. res. units without LSP Max. res. units with LSP Max. hotel rooms Max. showers at sport facilities see page 10 (C) IDM ENERGIESYSTEME GMBH Installation instructions Hygienik 2.0...
Page 9
1575 Single tapping volume at 45°C with LSP Tapping output l/min Max. residential units without LSP Max. residential units with LSP Max. hotel rooms Max. showers at sport facilities see page 10 (C) IDM ENERGIESYSTEME GMBH Installation instructions Hygienik 2.0...
Page 10
For a one-time storage tank charge calculated with: Weight specifi cation without Insulation and hot water station Tapping temperature 45°C Weight storage tank Hygienik 2000 Max 2.0 Cold water temperature 10°C Storage temperature 55°C Storage return temperature 25°C (C) IDM ENERGIESYSTEME GMBH Installation instructions Hygienik 2.0...
Page 11
9 l/min. at 45°C tapping temperature per bathtub and 42°C tapping temperature per shower Simultaneity factor: 1.5 times as high as that given in Handbuch für Heizung, Lüftung, Klima, Recknagl- Sprenger. (C) IDM ENERGIESYSTEME GMBH Installation instructions Hygienik 2.0...
Page 12
Mounting, hot water station Return, heat pump R 1 ½“ * Only one manual vent valve can be installed. An automatic vent valve can be installed on the top of the buff er tank. (C) IDM ENERGIESYSTEME GMBH Installation instructions Hygienik 2.0...
Page 13
Mounting, hot water station Return, heat pump R 1½“ * Only one manual vent valve can be installed. An automatic vent valve can be installed on the top of the buff er tank. (C) IDM ENERGIESYSTEME GMBH Installation instructions Hygienik 2.0...
Page 14
* Only one manual vent valve can be installed. An automatic vent in the heating buffer is no longer possible valve can be installed on the top of the buff er tank at the Hygienik with smooth tube heat exchanger! (C) IDM ENERGIESYSTEME GMBH Installation instructions Hygienik 2.0...
Page 15
Mounting, hot water station Return, heat pump R 1½“ * Only one manual vent valve can be installed. An automatic vent valve can be installed on the top of the buff er tank. (C) IDM ENERGIESYSTEME GMBH Installation instructions Hygienik 2.0...
Page 16
Mounting, hot water station Return, heat pump R 2“ * Only one manual vent valve can be installed. An automatic vent valve can be installed on the top of the buff er tank. (C) IDM ENERGIESYSTEME GMBH Installation instructions Hygienik 2.0...
Page 17
Mounting, hot water station Return, heat pump R 2“ * Only one manual vent valve can be installed. An automatic vent valve can be installed on the top of the buff er tank. (C) IDM ENERGIESYSTEME GMBH Installation instructions Hygienik 2.0...
Page 18
R 1/2“ Drainage* 1/2” Holding for warm water station * Only one manual vent valve can be installed. An automatic vent valve can be installed on the top of the buff er tank. (C) IDM ENERGIESYSTEME GMBH Installation instructions Hygienik 2.0...
4 .1. In st all at i o n co n di t io n s f o r t h e H yg ie n ik 2 .0 The iDM Hygienik 2.0 should be installed as close as The insulation jacket and the hood must...
fi xed in position as shown on tilting, have a second person lift the tank slightly. the equipment identifi cation sticker on the tank body using the sensor terminal block. (C) IDM ENERGIESYSTEME GMBH Installation instructions Hygienik 2.0...
Page 22
Store the insulation jacket in a warm room prior to installation, or wait until the tank has heated before closing the hook fastening strip! Pull the insulation jacket on carefully to avoid damaging it! (C) IDM ENERGIESYSTEME GMBH Installation instructions Hygienik 2.0...
Page 23
After the lower and upper parts of the insulation are mounted correctly, the delivered band can be fi xed. The band is necessary, to cover the gap between the two insulation parts and to guarantee a proper thermal insulation. (C) IDM ENERGIESYSTEME GMBH Installation instructions Hygienik 2.0...
Page 24
Plug Insulating material made of fl eece Hygienik 500 l - 1000 l Hygienik 1500 l - 2000 l Polystyrene covers (C) IDM ENERGIESYSTEME GMBH Installation instructions Hygienik 2.0...
The 25 l or 35 l hot water stations can either be mounted directly on the Hygienik 2.0 or on the wall. The 50 l hot water station can be mounted on the Hygienik 2.0 with a capacity of 1000 l, 1500 l and 2000 l.
fi xed on the mounts by two delivered screws. The hot Fit the Armafl ex insulation supplied over the corrugat- water station is hooked into the holder must be fi xed ed hoses before connecting them to the Hygienik 2.0. with the third included screw below. (C) IDM ENERGIESYSTEME GMBH...
fi tting is capable of bearing the weight of the mounted hot water station during op- eration. Working from the front, slide the iDM cover hood onto Retaining screw the hot water station in straight position until it snaps When the hot water station is mounted on the wall into place.
Page 29
The ball valves shown below are included in the scope of delivery of the 50 l and 70 l hot water stations. It is essential to fi t these valves on the construction site if the hot water stations is to be mounted on the wall and not on the Hygienik 2.0. Tank fl ow Hot water fl...
The circulation pipe is passed under the return pipe of the hot water station. Remove the plug from the return line connection and connect the circulation pipe here. Remove the perforated plate for the recess of the circulation pump with a side cutter. (C) IDM ENERGIESYSTEME GMBH Installation instructions Hygienik 2.0...
Page 31
Circulation pipe Ready assembled circulation module Since this circulation module cannot be used to comply with the drinking water ordinance, it may only be used for single-family homes for hot water comfort improvement. (C) IDM ENERGIESYSTEME GMBH Installation instructions Hygienik 2.0...
The temperature sensor of the heat meter is installed in the tank fl ow. Mount Operating unit The mount for the operating unit is attached at the side. The operating unit is attached with a screw-on con- nection. (C) IDM ENERGIESYSTEME GMBH Installation instructions Hygienik 2.0...
Page 33
Heat quantity meter meter. Corrugated hose Fully assembled heat quantity meter The operation and functions of the heat meter are described in detail in the enclosed instruction. (C) IDM ENERGIESYSTEME GMBH Installation instructions Hygienik 2.0...
Remove the operating unit of the controller and fi x the housing to the bracket using the two fi xing screws. Then replace the operating unit. The controller, the pump and the sensor are connected as shown in the circuit diagram. The circuit diagram is enclosed with the UVR 67. (C) IDM ENERGIESYSTEME GMBH Installation instructions Hygienik 2.0...
5 . 7. C on n ec tin g t o t h e h ot w a t er s t a t io n o n optional iDM circulation module for the th e d ri n ki n g w at e r s ide 25 l and 35 l hot water stations.
Heat distribution system (low-temperature heating) Legend and notes on the installation layouts Circulation pump Solutions from iDM are designed to offer the broadest 3-way mixing valve (without bypass), motor drive possible range of applications for heat pumps. Both 3-way mixing valve, thermal activation innovation through diversity and the use of already ex- isting heat generation systems are key considerations.
6.2.2 TERRA SW Complete HGL + Hygienik 2.0 with LSP and circulation S4.2-0-1-0-1 6.2.3 TERRA SWM HGL + Hygienik 2.0 + Termo + 1 HC + Passive cooling S2.2-0-2+5-1-0 6.2.4 AERO ALM + Hygienik 2.0 with LSP + circulation L7.1.0-1-0-1 6.2.5...
Page 38
6 .2. 1. TERRA SW Com p le t e HG L + H yg ie nik 2. 0 + di r e c t he at i ng c i r c u i t S 4. 2- 0 - 2- 0 - 0 (C) IDM ENERGIESYSTEME GMBH Installation instructions Hygienik 2.0...
Page 39
6 . 2.2. T ERRA SW Com ple t e + Hyg ie nik 2.0 + 3 he at ing ci r c u i t s S 4. 1- 0 - 1- 0- 0 (C) IDM ENERGIESYSTEME GMBH Installation instructions Hygienik 2.0...
Page 40
6 .2. 3. TERRA SW Com p le t e HG L + H yg ie nik 2. 0 wi t h L S P + c i r c u l at i o n S 4. 2- 0- 1 - 0- 1 (C) IDM ENERGIESYSTEME GMBH Installation instructions Hygienik 2.0...
Page 41
6 . 2.4. T ERRA SW M HG L + H yg ie n ik 2 .0 + Te r mo + 1 H C + Pas s iv e c o o l i ng S 2 . 2- 0- 2 +5- 1-0 (C) IDM ENERGIESYSTEME GMBH Installation instructions Hygienik 2.0...
Page 42
6 .2. 5. A ERO AL M + H yg ie n ik 2 .0 w i t h s epar at i n pl at e + c i r c u la t i o n L 7. 1 - 0- 1- 0- 1 (C) IDM ENERGIESYSTEME GMBH Installation instructions Hygienik 2.0...
6 . 2.6. A ERO AL M + Sol ar 1 2 m + H yg inik 2. 0 w i t h s e par at i ng p la t e + 1 H C L 7 . 1- 6- 3-0- 0 (C) IDM ENERGIESYSTEME GMBH Installation instructions Hygienik 2.0...
Page 44
6. Ins t a lla ti on layo uts Installation layouts 6 .2. 7. TERRA AL 6 0 M ax + Hyg ie n ik 2.0 + Te r mo L 5. 1- 1- 2 +5- 0 - 0 (C) IDM ENERGIESYSTEME GMBH Installation instructions Hygienik 2.0...
The pH value should lie between 8.2 tures for the consumers, limescale formation can be and 9.5. distributed evenly and in a targeted manner over the heat exchanger surfaces of the boiler. (C) IDM ENERGIESYSTEME GMBH Installation instructions Hygienik 2.0...
7. 8 . Cl e ani ng a nd de c al ci fi ca t io n in t er v al s Should it become necessary to drain the Hygienik 2.0 The plate heat exchanger of the hot water station must in order to carry out repair work, the system must be be decalcifi...
8. 8. 8 Elektrischer Anschluss 8. Allgemeine Beschreibung Allgemeine Beschreibun Allgemeine Beschreibun 8. Appendix 8 . 1. CE - Dec la rat i on of Con f or m it y (C) IDM ENERGIESYSTEME GMBH Montageanleitung iPump ALM...
Page 48
PRACTICAL KNOWLEDGE FOR SALES AND TECHNOLOGY The comprehensive range of seminars for sp ecialists at the IDM POWER FA MILY is available to you any time on our website. We look for ward to re ceiving your re gist ration.