Window Requirements; Storm Window Requirements - GE ASH06LK Owner's Manual And Installation Instructions

Ge ash06lk: user guide
Table of Contents

Advertisement

Available languages

Available languages

WINDOW REQUIREMENTS

1
• These instructions are for a standard
double-hung window. You will need to modify
them for other types of windows.
• All supporting parts must be secured to firm
wood, masonry or metal.
• The electrical outlet must be within reach
of the power cord.
• Follow the dimensions in the table and
illustration for your model.
Models
ASR05
11 3/4 min.
ASH06
(With accordion panels)

STORM WINDOW REQUIREMENTS

2
A storm window frame will not allow the air
conditioner to tilt toward the outside and will
keep it from draining properly. To adjust for this,
attach a piece of wood to the sill.
WOOD PIECES –
WIDTH: 2
LENGTH: Long enough to fit inside the window
frame.
THICKNESS: To determine the thickness, place a
piece of wood on the sill to make it 1/2 higher
than the top of the storm window frame or the
vinyl frame.
Attach securely with nails or screws provided by
the installer.
1/2 higher
than storm
window
frame
Storm window
frame
Installation Instructions
A
B
22 –36
13 min.
22 –36
A
B
1/2 higher
than vinyl frame
(on some windows)
Wood
Sill
Vinyl frame
PREPARE AIR CONDITIONER
3
A
Remove the backing from the top
mounting rail seal strip and attach it
to the bottom of the top mounting rail.
Cut to size.
B
Install the top mounting rail with 3 or 4
type A screws (depending on the number
of holes in the top mounting rail) from the
outside of the case.
Top mounting
rail
Bottom
mounting rail
C
Loosen the lower screw on each side of
the case and hook a security bracket on
each side. To allow for later adjustment,
do not tighten the screws until you install
the unit in the window.
Security
bracket
11
Security
bracket

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ash06llAsr05llAsr05Ash06

Table of Contents