Download Print this page

Hyundai HX145 LCR Service Manual page 34

Crawler excavator
Hide thumbs Also See for HX145 LCR:

Advertisement

(4) (4)
4.939 m (16' 2") 2-piece boom and 2.50 m (8' 2") arm with dozer
4.939 m (16' 2") 2-piece boom and 2.50 m (8' 2") arm with dozer
Description
Operating weight
Bucket capacity (SAE heaped), standard
Overall length
Overall width, with 600 mm shoe
Overall height
Overall height of guardrail
Superstructure width
Overall height of cab
Ground clearance of counterweight
Engine cover height
Minimum ground clearance
Rear-end distance
Rear-end swing radius
Distance between tumblers
Undercarriage length
Undercarriage width
Track gauge
Track shoe width, standard
Height of blade
Ground clearance of blade up
Depth of blade down
Travel speed (low/high)
Swing speed
Gradeability
Ground pressure (600 mm shoe)
Max traction force
I (I')
J
K
A
Unit
kg (lb)
m
3
A
B
C
C'
D
E
F
G
H
I
mm (ft-in)
I'
J
K
L
M
N
O
P
Q
km/hr (mph)
rpm
Degree (%)
kgf/cm
kg (lb)
1-12-10
N
Specification
16680 (36770)
0.52 (0.68)
(yd
)
3
8150 (26' 9")
2600 (8' 6")
2900 (9' 6")
3215 (10' 7")
2500 (8' 2")
2900 (9' 6")
930 (3' 1")
2320 (7' 7")
440 (1' 5")
1500 (4' 11")
1500 (4' 11")
3090 (10' 2")
3798 (12' 6")
2600 (8' 6")
2000 (6' 7")
600 (24")
575 (1' 11")
410 (1' 4")
450 (1' 6")
3.3/5.5 (2.1/3.4)
0.42 (5.93)
(psi)
2
12000 (26455)
D
M
B (L)
145ZF2SP07
11.2
35 (70)

Hide quick links:

Advertisement

loading