BJ Live SHX Bubble Tube Installation Manual

Advertisement

Quick Links

SHX Bubble Tube
Installation Guide
Product name
User's Manual
References included in this manual
BJ-ETBS
February 2017
Version

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SHX Bubble Tube and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for BJ Live SHX Bubble Tube

  • Page 1 SHX Bubble Tube Installation Guide Product name User's Manual References included in this manual BJ-ETBS February 2017 Version...
  • Page 2 SHX bubble tube Installation Guide Safety Precautions  Please read the whole manual before you start.  The product should always be used under adult supervision.  Do not move or tip the tube once it is filled with water. For this reason it should be placed in the final position before filling.
  • Page 3 This model is suitable for rooms with SHX system, offering unlimited control options with any SHX elements. 1. Product components Bubble tube Protective box for the electronics DMX cable Power supply Control box *Kit of balls / fish for bubble tube (sold separately) SHX bubble tube Page 3...
  • Page 4 SHX bubble tube Installation Guide 2. Pre-installation requirements A 230V power supply must be provided for the tube. A DMX connection must be provided for the tube control. If you want to control more elements from the tube a second DMX connection must be provided to continue the signal.
  • Page 5 Fill the tube with clean water (if any water is spilled, dry it). 4. Start up The SHX bubble tube is pre-configured for use with the SHX System. Check that the tube's lighting can be controlled from the SHX Control software.
  • Page 6 SHX bubble tube Installation Guide Emptying the water from the tube The tube should be disconnected from the power supply before emptying the water. Do not empty the tube by tipping it when it is full. You can empty it using drainage pumps.
  • Page 7 Any damage or breakage caused during transport must be notified within three days of receipt. Calle Mare de Déu del Coll, 70,Local 08023 Barcelona Spain t.+34 93 285 04 37 fax + 34 93 553 56 34| info@bjliveat.com SHX bubble tube Page 7...

This manual is also suitable for:

Bj-etbs

Table of Contents