Download Print this page

Hawke 501/RCG Product Assembly Instructions page 3

Hide thumbs Also See for 501/RCG:

Advertisement

STEP A5: Remove Insert (2) From Coupler Housing (1)
Slide insert (2) out from Coupler Housing (1) and put to one side.
STEP A6: Clamp Armour/Braid
Slide coupler housing (1) over cable until it meets the spigot. Slide middlenut (7) up to coupler housing and hand tighten.
Grip the coupler housing (1) with a spanner/wrench. Use a second spanner/wrench to tighten middlenut (7) half to three quarters of a turn.
1
STEP A7: Inspect Armour/Braid
Unscrew the middlenut (7). The armour clamp ring (6) should now be locked in place.
Visually inspect that the armour/braid has been successfully clamped between the spigot (5) and the armour clamp ring (6). If clamping is
not satisfactory, repeat step 6.
Cut inner sheath in line with edge of spigot (5) and strip to expose cores.
1
STEP A8: Fit socket insert
Take socket insert (3) and review numbering on tip. Feed cable cores through the correct slot in the socket insert. Slide the socket insert (3)
down to the spigot (5) until it clicks in place.
Std insert as shown
Alt insert positions 1 & 3 reversed
STEP A9: Cut conductors to length and strip
Cut conductor to 26mm from top of spigot. Use the groove indicator in the
insert as a visual aid. The conductor should not extend past this cut line.
Strip conductor back past the insert shoulder which indicates the strip line.
TIP: Use a pen to mark cores in situ then remove insert to aid conductor
strip process.
The socket insert (3) may be removed from the spigot (5) to assist cable
stripping process then re installed as shown in step 3.
AI 2046 - Issue D / Page 3 of 7
2
Grip here
7
with wrench
5
5
3
*Click*
7
6
26mm
3
10mm
Cut line
Strip line
1
5
Images for illustration purposes only.
Product supplied may di er from that shown.

Advertisement

loading