Install The Finished Wall; Verify Depth And Install The Nipple - Jacob Delafon E8014 Instructions Manual

Table of Contents

Advertisement

Available languages

Available languages

  • ENGLISH, page 13
• To adjust the pipe depth, use a level or other straight edge to line up the edge of the
plaster guard with the front face of the studs.
• Install appropriate backing and strap the pipes at the adjusted depth.

4. Install the finished wall

10,5 cm
Cutout
• Install the water-resistant wall board.
• Cut out a 10.5 cm round hole, centered on the pipe nipple at each desired installation
location.
• Install the finished wall material..

5. Verify depth and install the nipple

• Remove the nipple.
REMARQUE : The minimum distance between the face of the tee/elbow and the sur-
face of the finished wall should be 5.7 cm.
• Measure the distance from the face of the tee/elbow to the surface of the finished
wall. Make any adjustments as needed.
Standard wall installation
Align mark with the front of
the stud face.
All installations
Tee or elbow
5.7 cm mini
English
Finished wall
Cutout
Nipple
10,5 cm
17

Advertisement

Table of Contents
loading

This manual is also suitable for:

E8013

Table of Contents