Download Print this page

Projecta INTELLI-RV Installation Manual page 3

500amp shunt module
Hide thumbs Also See for INTELLI-RV:

Advertisement

SETUP VIA THE APP
1 Enter setting menu,
Select "Shunt" option
SET UP VIA LCD
l Press the 'Light' button until the setting code is showing on the date time area which means the
monitor is ready for configuration. The 'PUMP' button and 'LOAD' button can be used to scroll
through the configuration menu.
Silent/Esc Switch
Pump/Up Switch
1 Press and hold "Pump" and "Load" buttons
PUMP
LOAD
2 Engineering Screen
displays
3 Press and hold "Light" button
4 Press "Load" button to scroll to "Module"
5 Press "Light" to select
6 Press "Load" to scroll to "BM"
More information https://www.caravansplus.com.au
2 Select "Active "to
enable BM500 shunt
7 Press "Light" to select
8 Press "Load" to scroll to "01"
9 Press "Light" to select
10 Press "Silent"
until you return to
Engineering Screen
LIGHT
11 Press and hold "Pump" and "Load" buttons
to exit engineering mode
12 Shunt set up complete
3 Confirm to complete
setup.
Light/Enter/Setting Switch
Load/Down Switch
SILENT
PUMP
LOAD
3

Advertisement

loading

This manual is also suitable for:

Pmshunt