Kohler K-11344 Installation And Care Manual page 3

Hide thumbs Also See for K-11344:
Table of Contents

Advertisement

Available languages

Available languages

Finished Floor
2. Prepare the Location For the Drain
IMPORTANT! For installation on a concrete floor, clearance for the drain assembly must be provided.
Refer to the template provided with the bath.
Provide access for making the final drain connection from below.
Verify adequate drain clearance so the bath will install properly.
Kohler Co.
1-1/2"
Gasket
(38 mm)
3
Bath
Frame
1207307-2-B

Advertisement

Table of Contents
loading

This manual is also suitable for:

K-14037

Table of Contents