Download Print this page

Installation - LabRepCo LABH-2-FM Owner's Manual

General purpose undercounter freezers

Advertisement

INSTALLATION

UNCRATING
Move the unit as close to the final location as possible before unpacking. Remove from the
box and the styrofoam base. The location should be as close as possible to the power outlet
so an extension cord is not needed. This unit requires a minimum of 4 inches of air flow
space in back and 3 inches on the sides and top. Do not store material on the top of this
unit.
LEVELING
You can level your unit with the screw-type adjustable leveling legs on the front corners of
the unit. Turn counterclockwise to raise the corner; turn clockwise to lower it. Leveling legs
are required in front only. Unit may have a slight tilt from front to back after legs are
installed. This is acceptable and is recommended on this unit.
POWER SOURCE
The supply circuit to this cabinet
must conform to all National and
Local Electrical Codes. Consult the
cabinet
Serial-Data
voltage, cycle, phase, and amp
requirements
connection.
VOLTAGE SHOULD
NOT VARY MORE THAN 5% FROM
SERIAL PLATE RATINGS.
recommended to prevent possible loss of product
due to over-loading or failure of other equipment
on the same circuit. PROTECT THE CIRCUIT WITH A
20 AMP DELAY-TYPE FUSE OR CIRCUIT BREAKER.
Do not use an extension cord. Be sure your unit is
properly grounded. Use the 3-prong plug provided
into a 3-prong grounded outlet. (Only this method
complies with national electrical codes, local codes
and ordinances.)
method is followed, you are not protected against
severe or lethal shock in the event of a short circuit
of an electrical component or wiring of the unit.
plate
for
before
making
A separate circuit is
Unless the above grounding
4

Advertisement

loading