Connecting Water Supply Hose - LG W96H44BTT Owner's Manual

Hide thumbs Also See for W96H44BTT:
Table of Contents

Advertisement

Installation

■ Connecting water supply hose

• Water supply pressure must be between 100 - 1000 kPa (1.0 - 10.0 kgf / cm
• Do not strip or crossthread when connecting inlet hose to the valve.
• If the water supply pressure is more than 1000 kPa, a water pressure reduction device should be installed.
• Periodically check the condition of the hose and replace the hose if necessary.
Step 1 : Check rubber seal inlet hose
connector
Rubber
Step 2 : Connect hose to water tap
Type - A : Connecting Screw-type hose to tap with thread
Type - B : Connecting Screw-type hose to tap without thread
Upper
connector
Fixing screw
Hose
seal
Rubber
packing
Plate
Water supply
hose
• Two rubber seals are supplied with the
water inlet hoses.
They are used for preventing water leaks.
Make sure the connections to taps are
sufficiently tight.
• Do not use pliers,multi grips or leverage tools
to tighten. Hand tighten only. Use a cloth if
necessary.
• Screw the hose connector onto water supply tap.
1.Unscrew the adapter ring plate and the 4
adapter retaining screws.
2.Push the adapter onto the end of the tap
so that the rubber seal forms a watertight
connection. Tighten the adapter ring plate
and the 4 screws.
3.Push the water supply hose vertically
upwards so that the rubber packing within
the hose can adhere completely to the tap
and then tighten it by screwing it to the
right.
).
2
11

Advertisement

Table of Contents
loading

Table of Contents