Water softener with 12 day series timer control (30 pages)
Summary of Contents for IBC Water SAST0922
Page 1
WATER SOFTENER SEMI AUTOMATIC TWIN TANK INSTALLATION & OPERATING INSTRUCTIONS Model : SAST0922 Serial No : ……………………….. Manufacturer and Supplier of FILTRATION & WATER TREATMENT PRODUCTS for commercial, industrial and residential application Telephone: (07) 3219 2233 Facsimile: (07) 3219 2266 Email: sales@ibcwater.com.au...
Page 2
The final colour is usually blue but with some water a greyish coloured end point is obtained. Using 100ml sample - Hardness ppm = (number tablets x 2) – 1 Contact IBC Water if further details are required. SAST0922 Page...
Page 3
CALCULATION 1000 x C D x H Select nearest lower whole number If necessary consult your dealer or IBC Water Treatment for advice on setting up the softener. EXAMPLE Household use for 2 people on 220 mg/l hard water using Model SAST0922 at 1050 grams capacity.
The drain line from the softener valve is under pressure during regeneration but for correct operation a maximum of 2.4m of 15NB pipe with no rises can be connected. A manual Bypass should be installed. SAST0922 Page...
To regenerate the softener, turn the timer knob clockwise a full turn ie. off to off (do not exert undue pressure) and release. The unit will then automatically regenerate and return to service. SAST0922 Page...
Page 7
During regeneration raw (hard) water is bypassed to service so it is advisable to regenerate the unit when water is not needed. SAST0922 Page...
Page 8
541-030 VALVE Water Conditioning Control System Installation, Operating and Maintenance Manual SAST0922 Page...
Page 9
AIR CHECK IS REQUIRED The slow rinse cycle position directs a slow flow of water down through the riser tube and up through the resin bed to drain. This slow flow of water pushes the brine solution through the resin bed. SAST0922 Page...
Iron build up in mineral tank. a. Increase salt dosage or regenerate b. Lower distributor basket crushed. more frequently. b. Replace basket and verify that the distributor is cut 1/2 inch below the top of the tank threads. SAST0922 Page...
Turn the seat in or out Note: Prior to re-instalment insure that the until the leak to drain stops. main return spring is centred over the main diaphragm and that the outside edges of the main diaphragm are tucked into the valve body. SAST0922 Page...
Page 14
6. Inspect the rubber seal on the check disc for wear. Clean or replace if necessary. 7. Re-install the check disc on body stem assembly. 8. Place a small amount of Dow 111 silicone based lubricant on the back cap centre post. SAST0922 Page...
Float Distance (X) SAS0715 100mm SAS0922 200mm SAS1029 260mm Adjustment of Softener Brine Valve Lift float rod to full up position. Set float to distance shown. Measure from the top of the crown nut to the bottom of the float. SAST0922 Page...