Initial Power Up, Calibration, And Registration (Ac Power Applied) - Cisco UPWL6028F User Manual

8x4 wireless residential gateway
Table of Contents

Advertisement

Chapter 3 Operation of Front Panel Indicators
Initial Power Up, Calibration, and Registration (AC
Power Applied)
The following chart illustrates the sequence of steps and the corresponding
appearance of the residential gateway front panel LED status indicators during
power up, calibration, and registration on the network when AC power is applied to
the residential gateway. Use this chart to troubleshoot the power up, calibration, a nd
registration process of your residential gateway.
Note: After the residential gateway completes Step 7 (Data Network Registration
Complete), the residential gateway proceeds immediately to Normal Operations. See
Normal Operations (AC Power Applied) (on page 18).
Front Panel LED Status Indicators During Initial Pow er Up, Calibration, and
Registration
Step:
Front Panel
Indicator
1
POWER
2
DS
3
US
4
ONLINE
5
LINK
6
USB
7
WIRELESS
ON/OFF
8
WIRELESS
SETUP
Front Panel LED Status
Indicators During Initial Pow er
Up, Calibration, and
Registration
High Speed Data Registration
(continued)
Step:
Front Panel
Indicator
1
POWER
2
DS
3
US
4
ONLINE
5
LINK
16
Part 1, High Speed Data Registration
1
2
3
Self
Downstream
Downstream
Test
Scan
Signal Lock
On
On
On
On
Blinking
On
On
Off
Off
On
Off
Off
On
Off, On, or
Off, On, or
Blinking
Blinking
On
Off, On, or
On or Blinking
Blinking
Off
On or Blinking
On or Blinking
Off
On or Blinking
On or Blinking
7
Data Network
Registration
Complete
On
On
On
On
On
4
5
Ranging
Requesting IP
Address
On
On
On
On
Blinking
On
Off
Off
Off, On, or
Off, On, or
Blinking
Blinking
On or
On or Blinking
Blinking
On or
On or Blinking
Blinking
On or
On or Blinking
Blinking
6
Request High Speed
Data Provisioning
File
On
On
On
Blinking
Off, On, or Blinking
On or Blinking
On or Blinking
On or Blinking
OL-29159-02

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dpc3828

Table of Contents