This appliance is not to be used by persons (including children) with reduced physical, sensory or mental capabilities, or lack of experience and knowledge, unless they have been given supervision or instruction. Children being supervised not to play with the appliance. Sanden Heat Pump – Owner’s Manual Page 1 of 20...
No liability can be accepted for any consequences that may arise as a result of its application No liability can be accepted for any consequences that may arise as a result of its application. Sanden is in a process of continuous improvement with, therefore specifications may be different to those referenced in this manual –...
Introduction The Sanden Heat Pump Water Heater System has been designed using the latest refrigeration technology to remove the heat from the air to heat water. The refrigerant we use is CO which does not contribute to global warming so it allows us to help keep a clean healthy earth for future generations.
Page 6
· Ensure not to put anything around the heat pump unit. Could result in poor performance and unexpected problems. In the winter in particular please pay attention to any snow coverage. Sanden Heat Pump – Owner’s Manual Page 6 of 20...
Installation details This Sanden Eco Hot water Heat Pump System must be installed by a licensed person in consideration of the following standards and regulations: AS/NZS3500 National plumbing and drainage code hot water supply systems – acceptable solutions HB 263-2004 Heated water systems plumbing industry commission...
If the system is equipped with freeze protect heaters, also do not shut the power supply to the heaters. Failure to do so may cause a crack on the pipes due to the pipes getting frozen. Sanden Heat Pump – Owner’s Manual Page 9 of 20...
HP outlet temperature thermistor E012 E034 Water circulation pump locked wire break E040 HP discharge temperature ~ E013 System control error thermistor wire break E089 HP defrost temperature E014 thermistor wire break Sanden Heat Pump – Owner’s Manual Page 10 of 20...
Open the water drain plugs (2 places) on the Heat Pump Water drain plugs Unit. Close the plugs after no air is confirmed in the water supply. Then connect power to the Heat Pump Unit. Open Faucets. Sanden Heat Pump – Owner’s Manual Page 11 of 20...
The type of off-peak connection may need to be changed if hot water supply is not maintained as required. Figure 5: Outline of electrical system connections Caution Use Copper wiring Sanden Heat Pump – Owner’s Manual Page 12 of 20...
Attach the terminal block cover and piping cover back on the heat pump unit. Figure 6: Connect power cables White Black Green 3×M4 Screws Power supply Ground Wire holder band Power line Sanden Heat Pump – Owner’s Manual Page 13 of 20...
※1 Test condition : Outlet water setting 60℃, Inlet water 17℃, Ambient temperature Dry Bulb 19.7℃ / Wet Bulb 13.8℃ ※2 Test condition : Outlet water setting 60℃, Inlet water 9℃, Ambient temperature Dry Bulb 7℃ / Wet Bulb 6℃ Sanden Heat Pump – Owner’s Manual Page 15 of 20...
Page 16
Hot water storage tank unit REFER Drawing provided with tank GAUS- GAUS- GAUS- GAUS- Model No: 315EQS 315EQT 250EQTB 160EQTB Sanden Heat Pump – Owner’s Manual Page 16 of 20...
Warranty Exclusions 1. Repair and replacement work will be carried out as set out in the Sanden Heat Pump Water Heater System warranty. However the following exclusions may void the warranty and may incur additional service charges and/or cost of parts: 2.
Subject to the Warranty Conditions and Exclusions stated above, your Sanden Heat Pump Water Heater System is warranted in a Residential application as follows: Heat pump unit – Sanden warrants all parts labour on the SANDEN water heater system for a period of 6 (Six) years from date of installation.
Suppliers Name ________________________________________________________________ You may register your product via our website, to ‘http://www.sanden-hot-water.com.au/'. Please Note: Similar registration details will be provided to Sanden by your supplier/installer to validate their claim for warranty support; it is essential that the dates of supply/installation correspond to within one month.