Page 1
SM-1100 Auxiliary Switch Assembly Powered by Safety ®...
Page 2
Auxiliary Switch Assembly SM-1100 Contact Information Powell Electrical Systems, Inc. www.powellind.com info@powellind.com Service Division PO Box 12818 Houston, Texas 77217-2818 Tel: 713.944.6900 Fax: 713.948.4569 Powered by Safety ®...
Page 3
“IMPORTANT”. This is defined as: IMPORTANT IMPORTANT IMPORTANT indicates a section of the manual covering a non hazardous situation, but one where Powell feels proper attention is warranted. Powered by Safety ®...
SM-1100 Contents Ch 1 General Information ....................1 A. S ................................2 cope B. p ................................2 urpoSe Ch 2 Safety ........................3 A. S ............................3 ondition B. S ...............................3 Afety uidelineS c. G ................................4 enerAl d. S ................................4 pecific e. X-r ................................5 f. S ..............................5...
Page 5
Auxiliary Switch Assembly SM-1100 This page is intentionally left blank. Powered by Safety ®...
This document and all other documentation shall be fully read, understood, and all warnings and cautions shall be abided by. If there are any discrepancies or questions, the user shall contact Powell immediately at 1.800.480.7273.
Auxiliary Switch Assembly SM-1100 A. S cope WARNING WARNING The information in this maintenance procedure Be sure to follow the appropriate safety describes the following Auxiliary Switch precaution while handling any of the Assembly: equipment. Failure to do so may result in • 102108LN...
SM-1100 Ch 2 Safety B. S Afety uidelineS Study this maintenance procedure and all other A. S ondition associated documentation before installing the undervoltage device. The information in Section A is quoted from NFPA 70E 2004 - Article 120, 120.1 Establishing an Each user has the responsibility to instruct Electrically Safe Work Condition.
DO pecific NOT FORCE THE PARTS INTO POSITION. 1. DO NOT WORK ON AN ENERGIZED CONTACT POWELL FOR INSTRUCTIONS. CIRCUIT BREAKER. If work must be performed on a circuit breaker, remove it from service and remove it from the metal-clad switchgear.
SM-1100 e. X-r f. S Afety ABelS When high voltage is applied across the The equipment described in this document has DANGER, WARNING, CAUTION, and contacts of a vacuum interrupter, there is the possibility of generation of X-rays. The intensity instruction labels attached to various locations.
Auxiliary Switch Assembly SM-1100 Ch 3 Equipment Description Figure 1 Auxiliary Switch Assembly A. G enerAl The auxiliary switch (Figure 1) is located on the lower left front of the mechanism area (Figure 2, b). CAUTION CAUTION Ensure that the control circuits are...
SM-1100 Ch 4 Installation Figure 3 “E” Ring Removal A. r emovinG the uXiliAry Witch SSemBly nStAllinG the eplAcement uXiliAry Witch SSemBly 1) Removing the Old Auxiliary Switch Assembly Perform the following steps to replace the auxiliary switch assembly: CAUTION CAUTION a.
Auxiliary Switch Assembly SM-1100 Figure 5 Disconnecting Wires from Auxiliary Figure 6 Installing Auxiliary Switch Switch a. 10 - 32 x 1⁄2” R.H. Machine Screw b. 10 - 32 Star Nut a. Auxiliary Switch b. Auxiliary Switch Wires b. Insert the operating arm (Figure 7, a)
SM-1100 c. Secure the operating arm to the operations counter linkage with the “E” ring removed in section Ch 4 Installation, A. r emovinG the uXiliAry Witch SSemBly And nStAllinG eplAcement uXiliAry Witch SSemBly 1) Removing the Old Auxiliary Switch Assembly, Step b.
Page 15
Auxiliary Switch Assembly SM-1100 This page is intentionally left blank. Powered by Safety ®...
Need help?
Do you have a question about the SM-1100 and is the answer not in the manual?
Questions and answers