Installation - Whale INSTANT MATCH PREMIUM SDP303T Installation Manuallines

Table of Contents

Advertisement

lumbing of the Waste Pipe

Installation

1. Plumbing drainage pipe
and hot and cold supplies
• Run 22mm pipe from gulley to pump inlet (max 2m).
• Only slow radius or pre-formed bends to be used.
• Sensor provided with 1m of cable. Additional cable
purchased separately (part number SDS281T).
2. Locating your pump on the wall
• Select a suitable location for the pump, considering
the best plumbing option for the pump outlet to
discharge into the waste pipe. The pump head may
be rotated to the left hand side or right hand side.
• Mount square to wall.
• Using a spirit level ensure that the unit is mounted level.
• Do not install the pump inlet/outlet more than
500mm off the floor.
• NOTE: The pump and transformer mounting location
on the backplate may be swapped right to left / left to
right. See Page 14 for further information.
8
HOT
COLD